G05B 2219/32
Operator till task planning
G05B2219/32 (Operator till task planning) appears on 4,581 US grants and 5,767 published applications in this corpus.
Search patents in G05B- Granted patents
- 4,581
- Published applications
- 5,767
- Assignees
- 1,790
- Inventors
- 12,682
- Latest grant
- 6 Oct 2026
Filings by year
| Year | Granted patents | Published applications |
|---|---|---|
| 1977 | 1 | 0 |
| 1978 | 1 | 0 |
| 1979 | 0 | 0 |
| 1980 | 0 | 0 |
| 1981 | 1 | 0 |
| 1982 | 1 | 0 |
| 1983 | 1 | 0 |
| 1984 | 2 | 0 |
| 1985 | 1 | 0 |
| 1986 | 2 | 0 |
| 1987 | 3 | 0 |
| 1988 | 1 | 0 |
| 1989 | 6 | 0 |
| 1990 | 3 | 0 |
| 1991 | 7 | 0 |
| 1992 | 9 | 0 |
| 1993 | 26 | 0 |
| 1994 | 21 | 0 |
| 1995 | 23 | 0 |
| 1996 | 35 | 0 |
| 1997 | 30 | 0 |
| 1998 | 50 | 0 |
| 1999 | 42 | 0 |
| 2000 | 41 | 0 |
| 2001 | 58 | 23 |
| 2002 | 69 | 136 |
| 2003 | 105 | 161 |
| 2004 | 146 | 153 |
| 2005 | 133 | 172 |
| 2006 | 157 | 148 |
| 2007 | 111 | 155 |
| 2008 | 100 | 158 |
| 2009 | 85 | 139 |
| 2010 | 123 | 127 |
| 2011 | 108 | 92 |
| 2012 | 95 | 112 |
| 2013 | 78 | 116 |
| 2014 | 80 | 125 |
| 2015 | 84 | 178 |
| 2016 | 104 | 221 |
| 2017 | 125 | 240 |
| 2018 | 180 | 311 |
| 2019 | 254 | 432 |
| 2020 | 284 | 419 |
| 2021 | 305 | 382 |
| 2022 | 335 | 461 |
| 2023 | 318 | 483 |
| 2024 | 322 | 361 |
| 2025 | 337 | 264 |
| 2026 | 178 | 198 |
By publication year. Applications have been published since 2001. 2026 runs to 8 Oct.
Subgroups
Granted patents
- G05B 2219/32128Gui graphical user interfaceIndexing code304
- G05B 2219/32014Augmented reality assists operator in maintenance, repair, programming, assembly, use of headIndexing code233
- G05B 2219/32368Quality controlIndexing code229
- G05B 2219/32287Medical, chemical, biological laboratoryIndexing code190
- G05B 2219/32194Quality predictionIndexing code185
- G05B 2219/32015Optimize, process management, optimize production lineIndexing code129
- G05B 2219/32187Correlation between controlling parameters for influence on quality parametersIndexing code117
- G05B 2219/32234Maintenance planningIndexing code112
All 382 subgroupsShow fewer
- G05B 2219/32182If state of tool, product deviates from standard, adjust system, feedbackIndexing code100
- G05B 2219/32404Scada supervisory control and data acquisitionIndexing code100
- G05B 2219/32191Real time statistical process monitoringIndexing code98
- G05B 2219/32201Build statistical model of past normal proces, compare with actual processIndexing code96
- G05B 2219/32335Use of ann, neural networkIndexing code93
- G05B 2219/32193Ann, neural base quality managementIndexing code91
- G05B 2219/32196Store audit, history of inspection, control and workpiece data into databaseIndexing code89
- G05B 2219/32126Hyperlink, access to program modules and to hardware modules in www, webIndexing code84
- G05B 2219/32179Quality control, monitor production tool with multiple sensorsIndexing code77
- G05B 2219/32222Fault, defect detection of origin of fault, defect of productIndexing code77
- G05B 2219/32021Energy management, balance and limit power to toolsIndexing code73
- G05B 2219/32226Computer assisted repair, maintenance of system componentsIndexing code72
- G05B 2219/32252Scheduling production, machining, job shopIndexing code69
- G05B 2219/32177Computer assisted quality surveyance, caqIndexing code66
- G05B 2219/32301Simulate production, process stages, determine optimum scheduling rulesIndexing code65
- G05B 2219/32097Recipe programming for flexible batchIndexing code62
- G05B 2219/32266Priority ordersIndexing code59
- G05B 2219/32085Layout of factory, facility, cell, production system planningIndexing code58
- G05B 2219/32342Real time simulationIndexing code57
- G05B 2219/32359Modeling, simulating assembly operationsIndexing code57
- G05B 2219/32328Dynamic scheduling, resource allocation, multi agent negotiationIndexing code52
- G05B 2219/32343Derive control behaviour, decisions from simulation, behaviour modellingIndexing code51
- G05B 2219/32077Batch control systemIndexing code50
- G05B 2219/32197Inspection at different locations, stages of manufacturingIndexing code48
- G05B 2219/32291Task sequence optimizationIndexing code47
- G05B 2219/32351Visual, graphical animation of processIndexing code47
- G05B 2219/32258Resource, machine assignment preferences, actual and anticipated loadIndexing code45
- G05B 2219/32096Batch, recipe configuration for flexible batch controlIndexing code44
- G05B 2219/32017Adapt real process as function of changing simulation model, changing for betterIndexing code43
- G05B 2219/32283Machine scheduling, several machines, several jobsIndexing code43
- G05B 2219/32001Computer assisted machining, signals guide operator to manual machine objectIndexing code42
- G05B 2219/32137Configure, connect, combine different program modulesIndexing code42
- G05B 2219/32235Sharing of data between process control and maintenance management computersIndexing code42
- G05B 2219/32212If parameter out of tolerance reject productIndexing code41
- G05B 2219/32265Waiting, queue time, bufferIndexing code40
- G05B 2219/32228Repair, rework of manufactured articleIndexing code39
- G05B 2219/32129Select program for specified machine from library, file serverIndexing code37
- G05B 2219/32221Correlation between defect and measured parameters to find origin of defectIndexing code37
- G05B 2219/32142Define device, module description using xml format fileIndexing code36
- G05B 2219/32144Define device description using dd filesIndexing code36
- G05B 2219/32018Adapt process as function of results of quality measuring until maximum qualityIndexing code35
- G05B 2219/32181Monitor production, assembly apparatus with multiple sensorsIndexing code34
- G05B 2219/32297Adaptive scheduling, feedback of actual proces progress to adapt scheduleIndexing code34
- G05B 2219/32263Afo products, their components to be manufactured, lot selectiveIndexing code33
- G05B 2219/32053Adjust work parameter as function of other cellIndexing code32
- G05B 2219/32161Object oriented control, programmingIndexing code32
- G05B 2219/32186Teaching inspection data, pictures and criteria and apply them for inspectionIndexing code32
- G05B 2219/32189Compare between original solid model and measured manufactured objectIndexing code32
- G05B 2219/32304Minimize flow time, tact, shortest processing, machining timeIndexing code32
- G05B 2219/32306Rules to make scheduling decisionsIndexing code32
- G05B 2219/32037Order pickingIndexing code30
- G05B 2219/32082Planing, material requiring planning mrp, requestIndexing code30
- G05B 2219/32254Work sequence, alternative sequenceIndexing code30
- G05B 2219/32365For resource planningIndexing code30
- G05B 2219/32407Real time processing of dataIndexing code30
- G05B 2219/32188Teaching relation between controlling parameters and quality parametersIndexing code28
- G05B 2219/32203Effect of material constituents, components on product manufacturedIndexing code28
- G05B 2219/32371Predict failure time by analysing history fault logs of same machines inIndexing code28
- G05B 2219/32267Dynamic throughput maximizationIndexing code27
- G05B 2219/32388Autonomous flexible system, cells and agv autonomousIndexing code27
- G05B 2219/32392Warehouse and loading, unloading station and shop and machining centers and inIndexing code27
- G05B 2219/32019Dynamic reconfiguration to maintain optimal design, fabrication, assemblyIndexing code26
- G05B 2219/32022Ordering, remote ordering, enter article and operations needed, create jobfileIndexing code25
- G05B 2219/32035Compose, configure article and orderIndexing code24
- G05B 2219/32256Due dates, pieces must be ready, priority of dates, deadlineIndexing code24
- G05B 2219/32338Use new conditions for model, check, calculate if model meets objectivesIndexing code24
- G05B 2219/32385What is simulated, manufacturing process and compare results with real processIndexing code24
- G05B 2219/32355Simulate control process using virtual busIndexing code23
- G05B 2219/32356For diagnosticsIndexing code23
- G05B 2219/32366Line performance evaluationIndexing code23
- G05B 2219/32422Tool management and database managementIndexing code23
- G05B 2219/32423Task planningIndexing code23
- G05B 2219/32024Remote ordering, electronic selection article and fitting to form of clientIndexing code22
- G05B 2219/32216If machining not optimized, simulate new parameters and correct machiningIndexing code22
- G05B 2219/32403Supervisory control, monitor and control system, by operator or automaticIndexing code22
- G05B 2219/32065Synchronise set points of processesIndexing code21
- G05B 2219/32218Sort workpieces as function of quality dataIndexing code21
- G05B 2219/32247Real time schedulerIndexing code21
- G05B 2219/32345Of interconnection of cells, subsystems, distributed simulationIndexing code21
- G05B 2219/32036Enter data, values for custom made articlesIndexing code20
- G05B 2219/32217Finish defect surfaces on workpieceIndexing code20
- G05B 2219/32271Decision of job dispatching, select job to process next on each machineIndexing code20
- G05B 2219/32049Store program data, manufacturing history on workpiece, shifts to nextIndexing code19
- G05B 2219/32195Feedforward quality controlIndexing code19
- G05B 2219/32237Repair and rework of defect, out of tolerance parts, rescheduleIndexing code19
- G05B 2219/32056Balance load of workstations by grouping tasksIndexing code18
- G05B 2219/32184Compare time, quality, state of operators with threshold valueIndexing code18
- G05B 2219/32233Scheduling repairIndexing code18
- G05B 2219/32243Rerouting partsIndexing code18
- G05B 2219/32268Available parts, available materialsIndexing code18
- G05B 2219/32339Object oriented modeling, design, analysis, implementation, simulation languageIndexing code18
- G05B 2219/32007Operator is assisted by expert system for advice and delegation of tasksIndexing code17
- G05B 2219/32043Program, information flowIndexing code17
- G05B 2219/32204Performance assuranceIndexing code17
- G05B 2219/32209Stop production lineIndexing code17
- G05B 2219/32352Modular modeling, decompose large system in smaller systems to simulateIndexing code17
- G05B 2219/32354Divide, analyse process into subprocesses, until elementary unit operationsIndexing code17
- G05B 2219/32398Operator controls setting, changing of setting, of different machinesIndexing code17
- G05B 2219/32099Capp computer aided machining and process planningIndexing code16
- G05B 2219/32117Resource allocation, of number of pallets, fixtures of each type to partIndexing code16
- G05B 2219/32154Object, attribute for geometry, technology, function oopIndexing code16
- G05B 2219/32239Avoid deadlock, lockupIndexing code16
- G05B 2219/32277Agv schedule integrated into cell scheduleIndexing code16
- G05B 2219/32334Use of reinforcement learning, agent acts, receives rewardIndexing code16
- G05B 2219/32406Distributed scadaIndexing code16
- G05B 2219/32058Execute program as function of deviation from predicted state, resultIndexing code15
- G05B 2219/32086Integrate process planning and job shop schedulingIndexing code15
- G05B 2219/32088Master production planning, highest levelIndexing code15
- G05B 2219/32095Text, menu driven editor for batch programming, phase sequence, parametersIndexing code15
- G05B 2219/32127Read identification of part and generate automatically manufacturing conditionsIndexing code15
- G05B 2219/32199If number of errors grow, augment sampling rate for testingIndexing code15
- G05B 2219/32207Action upon failure value, send warning, caution message to terminalIndexing code15
- G05B 2219/32214Display on screen what fault and which tool and what order toIndexing code15
- G05B 2219/32294Maximize throughput of cellIndexing code15
- G05B 2219/32298Designate at least two group of articles, first with priority, reschedule secondIndexing code15
- G05B 2219/32136Web service oriented architecture for manufacturing and automationIndexing code14
- G05B 2219/32178Normal and correction transferline, transfer workpiece if faultIndexing code14
- G05B 2219/32272Decision of next visiting machine selection, where job is to goIndexing code14
- G05B 2219/32198Feedforward inspection data for calibration, manufacturing next stageIndexing code13
- G05B 2219/32324Quality data determines optimum machine sequence selection, queuing rulesIndexing code13
- G05B 2219/32357Simulation of material handling, flexible conveyor system fcsIndexing code13
- G05B 2219/32121Read identification of pallet, conveyor and enter data for manufacturingIndexing code12
- G05B 2219/32135Apc advanced process control applicationsIndexing code12
- G05B 2219/32248Create schedule from elementary operations from databaseIndexing code12
- G05B 2219/32269Decision, of job release, select job to be launched next in shopIndexing code12
- G05B 2219/32361Master production schedulingIndexing code12
- G05B 2219/32033Send article design, needed material, packaging and shipping info to manufacturerIndexing code11
- G05B 2219/32074History of operation of each machineIndexing code11
- G05B 2219/32104Data extraction from geometric models for process planningIndexing code11
- G05B 2219/32145Manual, enter identification, name workpiece and teach manufacturing dataIndexing code11
- G05B 2219/32192After inspection create correction table with position, correction dataIndexing code11
- G05B 2219/32206Selection from a lot of workpieces to be inspectedIndexing code11
- G05B 2219/32244By using graphical display of array and selecting elements, rearrange themIndexing code11
- G05B 2219/32276For tool feeding scheduleIndexing code11
- G05B 2219/32293Minimize work in progress, system at maximum productivityIndexing code11
- G05B 2219/32329Real time learning scheduler, uses ann, fuzzyIndexing code11
- G05B 2219/32333Use of genetic algorithmIndexing code11
- G05B 2219/32364Simulate batch processingIndexing code11
- G05B 2219/32413Pc generates control strategy, download in plc to monitor and react toIndexing code11
- G05B 2219/32038Client can develop programs, parts on remote server located by manufacturerIndexing code10
- G05B 2219/32075Predict workpiece measurements from measurements of previous workpiecesIndexing code10
- G05B 2219/32344Modular verification of real time systemsIndexing code10
- G05B 2219/32005Graphical, text operator instructions synchronous with product distributionIndexing code9
- G05B 2219/32028Electronic catalog, to select material, resources, make lists with pricesIndexing code9
- G05B 2219/32051Central control, modify program follower computers as function of production demand fromIndexing code9
- G05B 2219/32061Central controls modules grouped according to functionIndexing code9
- G05B 2219/32089Action and material and technology combined to manufacture productIndexing code9
- G05B 2219/32091Algorithm, genetic algorithm, evolution strategyIndexing code9
- G05B 2219/32098Batch programming using oopIndexing code9
- G05B 2219/32118Loading, allocates operations and tools to selected part typeIndexing code9
- G05B 2219/32174Memory table parts classification and working, manufacturing conditionsIndexing code9
- G05B 2219/32183Test cellIndexing code9
- G05B 2219/32264Setup timeIndexing code9
- G05B 2219/32323Determine lot priority as function of sum of queue and processing timeIndexing code9
- G05B 2219/32009Optimal task allocation between operator and machineIndexing code8
- G05B 2219/32023Print label, instructions for operator and job code for machining parametersIndexing code8
- G05B 2219/32025Automatic marking of articleIndexing code8
- G05B 2219/32055Identify workpiece, read status centrally, machine, adapt status centrallyIndexing code8
- G05B 2219/32078Calculate process end time, form batch of workpieces and transport to processIndexing code8
- G05B 2219/32162Tasks or control icons are linked to form a jobIndexing code8
- G05B 2219/32224Identify parameters with highest probability of failureIndexing code8
- G05B 2219/32225Randomize workpiece treatment order within lot to improve lot-to-lot comparisonsIndexing code8
- G05B 2219/32241Resource editorIndexing code8
- G05B 2219/32337Simulation, statechart scIndexing code8
- G05B 2219/32341Grafcet model, graph based simulationIndexing code8
- G05B 2219/32389Reception, assembly, testing, management workorder, schedule, history, file, packingIndexing code8
- G05B 2219/32002Operator interface, manual control at cell, if host fails or priorityIndexing code7
- G05B 2219/32016Minimize setup time of machinesIndexing code7
- G05B 2219/32046On detection workpiece code load program for workpiece from centralIndexing code7
- G05B 2219/32059Send code, data for workpiece to each workstation to be used, updateIndexing code7
- G05B 2219/32064Production change overIndexing code7
- G05B 2219/32083Alternative, variant operation planning, revision specification of productIndexing code7
- G05B 2219/32107Operative process planningIndexing code7
- G05B 2219/32124Program hybrid system, part sequence, part continousIndexing code7
- G05B 2219/32125Maple manufacturing application programming environmentIndexing code7
- G05B 2219/32173Table, memory table with identification code for all parts to be usedIndexing code7
- G05B 2219/32205Use model error adapted to type of workpieceIndexing code7
- G05B 2219/32229Repair fault product by replacing fault partsIndexing code7
- G05B 2219/32257Tool replacement minimizationIndexing code7
- G05B 2219/32347Knowledge based simulation engine, use answers from user, databaseIndexing code7
- G05B 2219/32393Host and central distribution control between storage and cellsIndexing code7
- G05B 2219/32397Machining cellsIndexing code7
- G05B 2219/32424Task flow editingIndexing code7
- G05B 2219/32032Salesman creates order, system answers back with price, estimated dateIndexing code6
- G05B 2219/32101Case based process planning, using older, known caseIndexing code6
- G05B 2219/32105Calculate machining axis, best feasible orientation for machiningIndexing code6
- G05B 2219/32111Pps production planning systemIndexing code6
- G05B 2219/32153Exchange data between user, cad, caq, nc, cappIndexing code6
- G05B 2219/32155Editor and library for objectsIndexing code6
- G05B 2219/32158Object groups, for object replication, naming, messaging and retrievingIndexing code6
- G05B 2219/32208Rearrange production lineIndexing code6
- G05B 2219/32253As a function of, change of machine operationIndexing code6
- G05B 2219/32275Job, recipe cascading: no delay, next job is started immediatly when firstIndexing code6
- G05B 2219/32281Single machine scheduling, one machine, several jobsIndexing code6
- G05B 2219/32285Multi manipulator assembly cellIndexing code6
- G05B 2219/32331Network of coordinating planning systems for each cell, factoryIndexing code6
- G05B 2219/32332Expert schedulerIndexing code6
- G05B 2219/32348Process reengineering, rethink manufacturing process, continuous improveIndexing code6
- G05B 2219/32349Simulate effect of stoppages of production facilities, operate as function of simulationIndexing code6
- G05B 2219/32353Use elementary control task, finite state machine and loop, inhibit, synchronisation connectionsIndexing code6
- G05B 2219/32391Machining center, pallet stocker, setup station, conveyor, control unitIndexing code6
- G05B 2219/32411Derive control data from displayed element, logic for it and feedback dataIndexing code6
- G05B 2219/32006Operator addresses machines to give commands or retrieve dataIndexing code5
- G05B 2219/32027Order, plan, execute, confirm end order, if unfeasible execute exception operationIndexing code5
- G05B 2219/32029Enter also delivery location, transport means, kind of truckIndexing code5
- G05B 2219/32034Electronic market, network brokerIndexing code5
- G05B 2219/32057Control cell as function of correlation between stored and detected machine stateIndexing code5
- G05B 2219/32062Set machines to new lot work, send them operation schedule, nc andIndexing code5
- G05B 2219/32063Adapt speed of tool as function of deviation from target rate ofIndexing code5
- G05B 2219/32102Select machine typeIndexing code5
- G05B 2219/32157Create a new object by combining existing objectsIndexing code5
- G05B 2219/32211Outputs new workorders to operatorsIndexing code5
- G05B 2219/32213If parameter out of tolerance during limited time, accept product on conditionIndexing code5
- G05B 2219/32231Inspection and correction, repair station in one unit, correction data in memoryIndexing code5
- G05B 2219/32246Virtual reality based interface schedulerIndexing code5
- G05B 2219/32249Repair, rework of defect, out of tolerance part in next station byIndexing code5
- G05B 2219/32273Decision of job pulling, select job to put in input buffer ofIndexing code5
- G05B 2219/32305Fastest interrupt time, change jobs dynamically to fastest machineIndexing code5
- G05B 2219/32315Machine with least workIndexing code5
- G05B 2219/32336Normal, special order lines share some common machines, part of production lineIndexing code5
- G05B 2219/32369Cape-mode computer aided plant enterprise modeling environment for plant life cycle modelisationIndexing code5
- G05B 2219/32372Petrinet, coloured, inhibitor arc, timed, object token petrinetIndexing code5
- G05B 2219/32396Job shop, batch production systemIndexing code5
- G05B 2219/32412One engineering, workstation can supervise several processesIndexing code5
- G05B 2219/32414Workstation has two displays, for process control and for general applicationsIndexing code5
- G05B 2219/32418Machine workload balance, same tools for pool of machines for same operationsIndexing code5
- G05B 2219/32004Graphical, textual instructions, sheet for operator to resume processIndexing code4
- G05B 2219/32044Shift workpiece and agv, carriage data in memory on advance to nextIndexing code4
- G05B 2219/32079Use of common resourcesIndexing code4
- G05B 2219/32084Planning of configuration of product, based on componentsIndexing code4
- G05B 2219/32087Decentral planning, each plant involved takes part of globalIndexing code4
- G05B 2219/32109Divide process into machining methodsIndexing code4
- G05B 2219/32119Order handling and manufacturing module and offline monitoringIndexing code4
- G05B 2219/32147Edit teached data to change operation parameters of workstationsIndexing code4
- G05B 2219/32148Enter correction data at a station, also transmitted to all downstream stationsIndexing code4
- G05B 2219/32149Display working condition data, real measured data and toleranceIndexing code4
- G05B 2219/32165PetrinetIndexing code4
- G05B 2219/32166Convert petrinet to sequence program for cell and to control program forIndexing code4
- G05B 2219/32215If detected shape not correct, simulate new machine, tool and adapt pathIndexing code4
- G05B 2219/32232Inspection and correction, repair station are separate, transmit correction dataIndexing code4
- G05B 2219/32238Scheduler triggers generation of nc program for actual selected machineIndexing code4
- G05B 2219/32262Work manhours, number of operators and work placeIndexing code4
- G05B 2219/32286Monitoring items connected to certain different entities, activitiesIndexing code4
- G05B 2219/32302Each pallet has working plan, information and machine selection dataIndexing code4
- G05B 2219/32325Object oriented scheduling, use machine, part, tool object and coordinatorIndexing code4
- G05B 2219/32039Send also testing programIndexing code3
- G05B 2219/32042Halting, initiating or resuming production of a product on orderIndexing code3
- G05B 2219/32048Wait state between two successive machining stepsIndexing code3
- G05B 2219/32114Part type selection, for simultaneous processingIndexing code3
- G05B 2219/32132Sfc shop floor control, to develop and build control system for factoryIndexing code3
- G05B 2219/32134Dynamic generation of web pages from program codeIndexing code3
- G05B 2219/32138Select hardware, devices at workstation, needed for, to be used at cellIndexing code3
- G05B 2219/32163Indicate synchronisation tags on icons of tasksIndexing code3
- G05B 2219/32171Transform, convert operator goals and information into petri netsIndexing code3
- G05B 2219/32175Table with correlation between part codes and part classificationIndexing code3
- G05B 2219/32176Correspondance between manufacturing part list and design part listIndexing code3
- G05B 2219/32236Automatic order of parts needed for maintenance scheduleIndexing code3
- G05B 2219/32242Reschedule without propagation of interruptions to other cellsIndexing code3
- G05B 2219/32245Reentrant scheduling, workpiece can return to same machineIndexing code3
- G05B 2219/32255Required time for work temperature controlIndexing code3
- G05B 2219/32259Flexibility, polyvalent machine, large buffers, permutation operations, alternativeIndexing code3
- G05B 2219/32261Rearrange production line as function of operator ratingIndexing code3
- G05B 2219/32288Create daily or weekly production matrixIndexing code3
- G05B 2219/32295Production start time from order and production specification, satisfaction degreeIndexing code3
- G05B 2219/32303Convert program to fit rescheduled machineIndexing code3
- G05B 2219/32322Machines with least frequency of errorsIndexing code3
- G05B 2219/32358Strain, stress of manual work, operator strainIndexing code3
- G05B 2219/32395Manufacturing structure is flow shop, mass productionIndexing code3
- G05B 2219/32003Manual control at central control to control workcell, select palletIndexing code2
- G05B 2219/32011Operator adapts manufacturing as function of sensed valuesIndexing code2
- G05B 2219/32026Order code follows article through all operationsIndexing code2
- G05B 2219/32031Use item and structure informationIndexing code2
- G05B 2219/32052Lookup table, identify job to be executed by leader or followerIndexing code2
- G05B 2219/32054Send request for object carry out to other cellIndexing code2
- G05B 2219/32067Change combinations of operation codes in station, id for flexibilityIndexing code2
- G05B 2219/32073If inspection needed, stop machining, execute separate inspection programIndexing code2
- G05B 2219/32076Adjust feedback from previous processes as function of elapsed timeIndexing code2
- G05B 2219/32094Dedicated language for batch processing, enter number of workpiecesIndexing code2
- G05B 2219/32116Production ratio, proportion in which selected part types will be producedIndexing code2
- G05B 2219/32122Documentation of programmable electronic systemIndexing code2
- G05B 2219/32131Use job graphIndexing code2
- G05B 2219/32133Commands from program of other controller cause recompilation of local programIndexing code2
- G05B 2219/32139Select at workstation control parameters for cell, nodeIndexing code2
- G05B 2219/32146Display parts, manufacturing conditions to enter conditions for selected partIndexing code2
- G05B 2219/32151Prepare teach data by selecting data from two tables as function ofIndexing code2
- G05B 2219/32159Each hardware unit together with its software forms one objectIndexing code2
- G05B 2219/32167Convert petrinet to ladder diagramIndexing code2
- G05B 2219/32219Slow down production after failureIndexing code2
- G05B 2219/32223Fixture failure diagnosis, measure assembly, derive influence of fixture on errorIndexing code2
- G05B 2219/32227On error detected by zone supervisor, maintenance of particular zoneIndexing code2
- G05B 2219/32251Normal and special order production lines for different types of workpieceIndexing code2
- G05B 2219/32274Event is triggered when first unit of first lot enters or lastIndexing code2
- G05B 2219/32278Schedule of overhead material handlers, robot gantryIndexing code2
- G05B 2219/32289Determine number of components, start of their production, allocate processorIndexing code2
- G05B 2219/32292Large, medium and fine schedule, with feedback from fine to largeIndexing code2
- G05B 2219/32309Shortest remaining capacityIndexing code2
- G05B 2219/32313Shortest remaining processing timeIndexing code2
- G05B 2219/32316First buffer first serve, fifoIndexing code2
- G05B 2219/32373Timed petrinet, timed event graphIndexing code2
- G05B 2219/32375Petrinet synthesis toolIndexing code2
- G05B 2219/32379Object oriented petrinetsIndexing code2
- G05B 2219/32408Case based diagnosis to assist decision maker, operatorIndexing code2
- G05B 2219/32416Tool information for program to use and needed timing, adapt timingIndexing code2
- G05B 2219/32008Operator changes schedule, workload in allowed range by graphical interfaceIndexing code1
- G05B 2219/32012Operator must signify his continued attendance at the workstationIndexing code1
- G05B 2219/32041Combine orders from different customersIndexing code1
- G05B 2219/32047Workcell end instruction selects next workpiece with related programIndexing code1
- G05B 2219/32066Central stores operation code in id and in concerned stationIndexing code1
- G05B 2219/32068Execution at station only permitted if operation code of station and idIndexing code1
- G05B 2219/32069Use of multiple id to prepare program for station before pallet inIndexing code1
- G05B 2219/32071Adaptive fuzzy controller, tunes itself as function of machine parameter variationIndexing code1
- G05B 2219/32081Sub batch, machine, assemble only part of the whole batchIndexing code1
- G05B 2219/32092Heuristic algorithm, accept feasible solution and attempt to improve itIndexing code1
- G05B 2219/32108From order, production time divide into special and normal operationsIndexing code1
- G05B 2219/32115Machine grouping, each machine in each group performs same operationsIndexing code1
- G05B 2219/32123Use of ms windows for automation, connected to mms manufacturing message systemIndexing code1
- G05B 2219/32143Use css style sheets as control parametersIndexing code1
- G05B 2219/32152Inhibit further editing of entered parametersIndexing code1
- G05B 2219/32156Each defined object has corresponding set of geometrical macrosIndexing code1
- G05B 2219/32168Generation and analysis of synthesis rules for petrinetIndexing code1
- G05B 2219/32169Stochastic pn, spnIndexing code1
- G05B 2219/32185Calculate entropy, disorderIndexing code1
- G05B 2219/32202Integration and cooperation between processesIndexing code1
- G05B 2219/32296If error search in a repair library, trained by operator, to correctIndexing code1
- G05B 2219/32299Divide job shop into number of workcentersIndexing code1
- G05B 2219/32311Shortest queue nextIndexing code1
- G05B 2219/32318Smallest value of product of imminent processing time with total processing timeIndexing code1
- G05B 2219/32319Shortest imminent operation time, part of machining timeIndexing code1
- G05B 2219/32326Local scheduler, each machine own scheduler, independent from defective machinesIndexing code1
- G05B 2219/32346Using acd, activity cycle diagramIndexing code1
- G05B 2219/32362Bulk manufacturing, handling dry or fluid productsIndexing code1
- G05B 2219/32363Batch job routing in operation overlappingIndexing code1
- G05B 2219/32386Arm accurate robot motion time model, needed in schedulingIndexing code1
- G05B 2219/32387Effects of highspeed hardware operations on throughput, use schedulerIndexing code1
- G05B 2219/32394Fractal manufacturing system with autonomous agents: observer, analyser, organiser, resolver, reporterIndexing code1
- G05B 2219/32405Hybrid supervisor control, des supervisor and diagnostic and alternate strategy routeIndexing code1
- G05B 2219/32013Operator marks processes, scheduler detects marks, releases control to operatorIndexing code0
- G05B 2219/32045Each machine knows sequence of pallets, each pallet knows sequence of operationsIndexing code0
- G05B 2219/32072Distributed fuzzy controllersIndexing code0
- G05B 2219/32093Search, adaptive, after each iteration some search directions are forbiddenIndexing code0
- G05B 2219/32103Select size of toolIndexing code0
- G05B 2219/32106Calculate machining volumes for turning operationsIndexing code0
- G05B 2219/32112Pps and ms office integratedIndexing code0
- G05B 2219/32113Machine load and characteristic curvesIndexing code0
- G05B 2219/32141Define type of i-o, analog, digital, pulseIndexing code0
- G05B 2219/32164Petrinet and procedural language combinedIndexing code0
- G05B 2219/32172Control petri net together with modeling petri net, cascadedIndexing code0
- G05B 2219/32279Operator scheduling for load, unload, walk and wait in a cell withIndexing code0
- G05B 2219/32282For a quick and slow production lineIndexing code0
- G05B 2219/32284Job shop, two, more operations may not occupy same machine simultaneouslyIndexing code0
- G05B 2219/32307Last buffer first serve, lifoIndexing code0
- G05B 2219/32308Shortest, narrowest non full queueIndexing code0
- G05B 2219/32312Largest imminent operation timeIndexing code0
- G05B 2219/32314Largest remaining processing timeIndexing code0
- G05B 2219/32317Smallest ratio for imminent processing time divided by total processing timeIndexing code0
- G05B 2219/32321Largest processing, machining timeIndexing code0
- G05B 2219/32327Structure, fuzzy logic expert system schedulerIndexing code0
- G05B 2219/32367Parallel experimentation machinesIndexing code0
- G05B 2219/32374Display of petrinet, graph editingIndexing code0
- G05B 2219/32376Coloured petrinetIndexing code0
- G05B 2219/32377Cbpn controlled batches petrinet, model influence control part on physical partIndexing code0
- G05B 2219/32378Fuzzy timed petrinetIndexing code0
- G05B 2219/32381Continuous petrinet, contrary of timed petrinetIndexing code0
- G05B 2219/32382Hybrid petrinet, comprises continuous and timed petrinetIndexing code0
- G05B 2219/32383Controlled speed continuous petrinet, considers delays in execution and transport timeIndexing code0
- G05B 2219/32384Fuzzy petrinet fpnIndexing code0
- G05B 2219/32399Select lan by switching bus connected to several lanIndexing code0
- G05B 2219/32401Select displays by switching bus connected to several displaysIndexing code0
- G05B 2219/32402Select one lan to be connected to one display by central controlIndexing code0
- G05B 2219/32409Adaptive agent for diagnostic, helps operator to describe new casesIndexing code0
- G05B 2219/32415Select tools in next workcell during transport workpieceIndexing code0
- G05B 2219/32417Minimize number of tools, only a specific machine can process certain operationsIndexing code0
- G05B 2219/32419All tools available, each part can fully be processed on a singleIndexing code0
- G05B 2219/32421Tool management incorporated in kernel of nc controlIndexing code0
Recent patents
- Heart valve manufacturing devices and methods6 Oct 2026US 12,751,816 B2Edwards Lifesciences Corporation
- Machine tool, machine tool control method, and non-transitory computer readable medium having machine tool control program6 Oct 2026US 12,754,528 B2Dmg Mori Co., Ltd.
- Quality abnormality analysis method, method of manufacturing metal material, and quality abnormality analysis device6 Oct 2026US 12,754,536 B2Jfe Steel Corporation
- User interface implementation method and apparatus6 Oct 2026US 12,754,745 B2Huawei Technologies Co., Ltd.
- Method for configuring a control system for a process plant29 Sep 2026US 12,747,912 B2Linde Aktiengesellschaft
- Machine tool system and application program8 Oct 2026US 2026/0310161 A1Star Micronics Co., Ltd.
- Scada web hmi system8 Oct 2026US 2026/0310172 A1TMEIC Corporation
- Production method and production line for implementing tool transfer exchange through workpiece transfer system8 Oct 2026US 2026/0310177 A1Kede Numerical Control Co., Ltd.
- Entity identification in a multistage entity coordination network8 Oct 2026US 2026/0310185 A1Honeywell International Inc.
- Process automation system with security interface8 Oct 2026US 2026/0310782 A1BASF SE
Most cited
By later US patents
- State models for monitoring process2,198US 6,665,648 B2Siebel Systems, Inc. · 2003
- Immersive video, including video hypermosaicing to generate from multiple video views of a scene a three-dimensional video mosaic from which diverse virtual video scene images are synthesized, including panoramic, scene interactive and stereoscopic images775US 5,850,352 AThe Regents of the University of California · 1998
- Machine dynamic selection of one video camera/image of a scene from multiple video cameras/images of the scene in accordance with a particular perspective on the scene, an object in the scene, or an event in the scene711US 5,729,471 AThe Regents of the University of California · 1998
- Method and apparatus for scheduling wafer processing within a multiple chamber semiconductor wafer processing tool having a multiple blade robot619US 6,074,443 AAPPLIED Materials.Inc. · 2000
- Method and system for using short ranged wireless enabled computers as a service tool600US 7,085,623 B2ASM International N.V. · 2006