G05B 2219/39159
Task modelling
G05B2219/39159 (Task modelling) appears on 7 US grants and 8 published applications in this corpus.
Search patents in G05B- Granted patents
- 7
- Published applications
- 8
- Assignees
- 9
- Inventors
- 27
- Latest grant
- 14 Oct 2025
Filings by year
| Year | Granted patents | Published applications |
|---|---|---|
| 2015 | 0 | 1 |
| 2016 | 0 | 0 |
| 2017 | 0 | 2 |
| 2018 | 1 | 2 |
| 2019 | 1 | 1 |
| 2020 | 4 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 1 | 1 |
| 2026 | 0 | 1 |
By publication year. 2026 runs to 8 Oct.
Recent patents
- Method for providing information for a robot device and an electronic computing device14 Oct 2025US 12,440,972 B2Bayerische Motoren Werke Aktiengesellschaft
- Industrial plant evaluation device and industrial plant evaluation method15 Sep 2020US 10,775,778 B2Mitsubishi Heavy Industries, Ltd.
- Closed-loop model parameter identification techniques for industrial model-based process controllers1 Sep 2020US 10,761,522 B2Honeywell Inc.
- Method and system for generating minimal cut-sets for highly integrated large systems12 May 2020US 10,649,444 B2The Boeing Company
- Optimization-based control with open modeling architecture systems and methods7 Jan 2020US 10,528,038 B2Rockwell Automation Technologies, Inc.
- Data analysis method and apparatus, electronic device, and storage medium29 Jan 2026US 2026/0029772 A1Boe Technology Group Co., Ltd.
- Method for Providing Information for a Robot Device and an Electronic Computing Device17 Apr 2025US 2025/0121494 A1Bayerische Motoren Werke Aktiengesellschaft
- Industrial plant evaluation device and industrial plant evaluation method17 Jan 2019US 2019/0018398 A1Mitsubishi Heavy Industries, Ltd.
- Method for fulfilling demands in a plan18 Oct 2018US 2018/0299872 A1APPLIED Materials.Inc.
- Closed-loop model parameter identification techniques for industrial model-based process controllers22 Mar 2018US 2018/0081348 A1Honeywell Inc.
Most cited
By later US patents
- Manufacturing execution system and method of determining production metrics for a line4US 10,054,936 B2Schneider Electric Software, LLC · 2018
- Method for fulfilling demands in a plan2US 10,496,081 B2APPLIED Materials.Inc. · 2019
- Optimization-based control with open modeling architecture systems and methods2US 10,528,038 B2Rockwell Automation Technologies, Inc. · 2020