F05D 2260/10
Particular cycles
F05D2260/10 (Particular cycles) appears on 31 US grants and 27 published applications in this corpus.
Search patents in F05D- Granted patents
- 31
- Published applications
- 27
- Assignees
- 20
- Inventors
- 51
- Latest grant
- 19 May 2026
Filings by year
| Year | Granted patents | Published applications |
|---|---|---|
| 1996 | 3 | 0 |
| 1997 | 3 | 0 |
| 1998 | 0 | 0 |
| 1999 | 0 | 0 |
| 2000 | 0 | 0 |
| 2001 | 0 | 0 |
| 2002 | 0 | 1 |
| 2003 | 1 | 0 |
| 2004 | 1 | 2 |
| 2005 | 2 | 4 |
| 2006 | 1 | 0 |
| 2007 | 0 | 0 |
| 2008 | 0 | 0 |
| 2009 | 1 | 0 |
| 2010 | 1 | 1 |
| 2011 | 0 | 0 |
| 2012 | 0 | 2 |
| 2013 | 0 | 1 |
| 2014 | 0 | 0 |
| 2015 | 0 | 1 |
| 2016 | 0 | 0 |
| 2017 | 0 | 1 |
| 2018 | 0 | 0 |
| 2019 | 2 | 3 |
| 2020 | 2 | 1 |
| 2021 | 1 | 2 |
| 2022 | 3 | 1 |
| 2023 | 4 | 2 |
| 2024 | 2 | 3 |
| 2025 | 2 | 1 |
| 2026 | 2 | 1 |
By publication year. Applications have been published since 2001. 2026 runs to 8 Oct.
Recent patents
- LNG cold power generation using mixed working fluid19 May 2026US 12,631,132 B2SK Gas Co., Ltd.
- Method and system for configuring operation of an engine7 Apr 2026US 12,595,768 B2Pratt & Whitney Canada Corp.
- Turbine engine with inverse Brayton cycle16 Dec 2025US 12,497,918 B2Rtx Corporation
- Optical in-situ inspection system7 Oct 2025US 12,435,642 B2Rtx Corporation
- Air bottoming cycle air cycle system source9 Jul 2024US 12,031,481 B2Rtx Corporation
- Optical in-situ inspection system8 Jan 2026US 2026/0009341 A1Rtx Corporation
- Optical in-situ inspection system27 Feb 2025US 2025/0067194 A1Rtx Corporation
- Lng cold power generation using mixed working fluid5 Dec 2024US 2024/0401504 A1SK Gas Co., Ltd.
- Turbine engine with inverse brayton cycle1 Aug 2024US 2024/0254917 A1Rtx Corporation
- Air bottoming cycle air cycle system source28 Mar 2024US 2024/0102418 A1Rtx Corporation
Most cited
By later US patents
- Hydrogen-rich fuel, closed-loop cooled, and reheat enhanced gas turbine powerplants106US 5,590,518 ACalifornia Energy Commission · 1997
- Performance enhanced gas turbine powerplants47US 5,490,377 ACalifornia Energy Commission · 1996
- Performance enhanced gas turbine powerplants43US 5,581,997 ACalifornia Energy Commission · 1996
- Performance enhanced gas turbine powerplants40US 5,678,408 ACalifornia Energy Commission · 1997
- Performance enhanced gas turbine powerplants33US 5,535,584 ACalifornia Energy Commission · 1996