E04B 1/3516
Characterised by erecting a vertical structure and then adding the floors from
Official title: {characterised by erecting a vertical structure and then adding the floors from top to bottom}
E04B1/3516 (Characterised by erecting a vertical structure and then adding the floors from) appears on 27 US grants and 23 published applications in this corpus.
Search patents in E04B- Granted patents
- 27
- Published applications
- 23
- Assignees
- 12
- Inventors
- 43
- Latest grant
- 25 Aug 2026
Filings by year
| Year | Granted patents | Published applications |
|---|---|---|
| 1987 | 1 | 0 |
| 1988 | 0 | 0 |
| 1989 | 1 | 0 |
| 1990 | 0 | 0 |
| 1991 | 1 | 0 |
| 1992 | 0 | 0 |
| 1993 | 0 | 0 |
| 1994 | 0 | 0 |
| 1995 | 2 | 0 |
| 1996 | 1 | 0 |
| 1997 | 1 | 0 |
| 1998 | 0 | 0 |
| 1999 | 0 | 0 |
| 2000 | 0 | 0 |
| 2001 | 0 | 0 |
| 2002 | 0 | 1 |
| 2003 | 0 | 1 |
| 2004 | 0 | 0 |
| 2005 | 0 | 1 |
| 2006 | 0 | 0 |
| 2007 | 0 | 0 |
| 2008 | 0 | 1 |
| 2009 | 0 | 0 |
| 2010 | 1 | 1 |
| 2011 | 0 | 0 |
| 2012 | 0 | 0 |
| 2013 | 0 | 1 |
| 2014 | 0 | 0 |
| 2015 | 0 | 2 |
| 2016 | 1 | 0 |
| 2017 | 1 | 2 |
| 2018 | 0 | 0 |
| 2019 | 2 | 1 |
| 2020 | 6 | 5 |
| 2021 | 1 | 1 |
| 2022 | 3 | 1 |
| 2023 | 0 | 1 |
| 2024 | 2 | 3 |
| 2025 | 1 | 1 |
| 2026 | 2 | 0 |
By publication year. Applications have been published since 2001. 2026 runs to 8 Oct.
Recent patents
- Methods and apparatuses for constructing high-rise buildings25 Aug 2026US 12,716,230 B2Urban Redwood
- System for fabricating a structure and a floorplate lifting system17 Feb 2026US 12,553,233 B2Big Time Investment, LLC
- Building assembly system and associated method8 Jul 2025US 12,352,058 B2Big Time Investment, LLC
- Top-down construction method for multi-storey basement with full steel structure10 Sep 2024US 12,084,854 B2China Construction Third Engineering Bureau Group South China Co., Ltd.
- Building assembly system and associated method27 Feb 2024US 11,913,242 B2Big Time Investment, LLC
- System for fabricating a structure and a floorplate lifting system7 Aug 2025US 2025/0250788 A1Big Time Investment, LLC
- Top-down construction method for multi-storey basement with full steel structure11 Jul 2024US 2024/0229451 A9China Construction Third Engineering Bureau Group South China Co., Ltd.
- Building assembly system and associated method23 May 2024US 2024/0167291 A1Big Time Investment, LLC
- Top-down construction method for multi-storey basement with full steel structure25 Apr 2024US 2024/0133175 A1China Construction Third Engineering Bureau Group South China Co., Ltd.
- Methods and apparatuses for constructing high-rise buildings23 Nov 2023US 2023/0374775 A1Urban Redwood
Most cited
By later US patents
- Concrete building frame construction method29US 5,528,877 A1996
- Slab construction system and method for constructing multi-story buildings using pre-manufactured structures18US 9,493,940 B2Innovative Building Technologies, LLC · 2016
- Vertical slip form construction system with multi-function platform, and method of constructing a building therewith16US 10,745,906 B1Big Time Investment, LLC · 2020
- Method of constructing a building, and a building construction system therefor11US 10,753,080 B1Big Time Investment, LLC · 2020
- Construction process for multiple-story concrete building11US 5,012,627 A1991