E02D 27/36
Foundations formed in moors or bogs
E02D27/36 (Foundations formed in moors or bogs) appears on 12 US grants and 9 published applications in this corpus.
Search patents in E02D- Granted patents
- 12
- Published applications
- 9
- Assignees
- 7
- Inventors
- 33
- Latest grant
- 2 Sep 2025
Filings by year
| Year | Granted patents | Published applications |
|---|---|---|
| 1978 | 1 | 0 |
| 1979 | 0 | 0 |
| 1980 | 0 | 0 |
| 1981 | 0 | 0 |
| 1982 | 0 | 0 |
| 1983 | 0 | 0 |
| 1984 | 0 | 0 |
| 1985 | 0 | 0 |
| 1986 | 1 | 0 |
| 1987 | 0 | 0 |
| 1988 | 0 | 0 |
| 1989 | 0 | 0 |
| 1990 | 0 | 0 |
| 1991 | 0 | 0 |
| 1992 | 0 | 0 |
| 1993 | 0 | 0 |
| 1994 | 0 | 0 |
| 1995 | 0 | 0 |
| 1996 | 0 | 0 |
| 1997 | 0 | 0 |
| 1998 | 1 | 0 |
| 1999 | 0 | 0 |
| 2000 | 1 | 0 |
| 2001 | 0 | 0 |
| 2002 | 0 | 0 |
| 2003 | 0 | 0 |
| 2004 | 0 | 2 |
| 2005 | 0 | 0 |
| 2006 | 0 | 0 |
| 2007 | 1 | 0 |
| 2008 | 0 | 0 |
| 2009 | 0 | 0 |
| 2010 | 1 | 0 |
| 2011 | 0 | 0 |
| 2012 | 0 | 0 |
| 2013 | 0 | 0 |
| 2014 | 0 | 0 |
| 2015 | 0 | 1 |
| 2016 | 1 | 1 |
| 2017 | 1 | 0 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 2 |
| 2023 | 2 | 0 |
| 2024 | 0 | 2 |
| 2025 | 2 | 1 |
By publication year. Applications have been published since 2001.
Recent patents
- Floating building development2 Sep 2025US 12,404,649 B2Joshua & Holger Kristan GbR
- Method for constructing fixed monitoring pile for mining area with high phreatic water level7 Jan 2025US 12,188,198 B2Huainan Mining (Group) Co., Ltd
- Floating foundation5 Sep 2023US 11,746,495 B2
- Multi-impeller passive-rotating-stirring-type rotary drilling rig for open caissons4 Jul 2023US 11,692,401 B2Zhejiang University
- Drilling rig equipment platform15 Aug 2017US 9,732,564 B2Cenovus Energy Inc.
- Floating building development27 Nov 2025US 2025/0361693 A1Joshua & Holger Kristan GbR
- Method for constructing fixed monitoring pile for mining area with high phreatic water level3 Oct 2024US 2024/0328108 A1Huainan Mining (Group) Co., Ltd
- Floating building development25 Jan 2024US 2024/0026629 A1Joshua & Holger Kristan GbR
- Multi-impeller passive-rotating-stirring-type rotary drilling rig for open caissons20 Oct 2022US 2022/0333444 A1Zhejiang University
- Floating foundation26 May 2022US 2022/0162827 A1
Most cited
By later US patents
- Hollow screw-in pile19US 6,142,712 A2000
- Temporary platform or roadway and method of assembling same14US 7,249,912 B22007
- Drilling rig equipment platform12US 9,447,643 B2Cenovus Energy Inc. · 2016
- Consolidation construction for improving soft, unstable foundation11US 4,089,183 ATakenaka Doboku Co., Ltd. · 1978
- Arrangement of a building mobile between two positions, one supported on the ground and the other floating10US 7,793,466 B22010