Fast Frames (UK) Limited
Dorset, GB· latest recorded location
Fast Frames (UK) Limited is named on 5 US grants and 5 published applications in this corpus. Its most frequent classification is E02D (Foundations).
- Granted patents
- 5
- Published applications
- 5
- Inventors
- 1
- Granted in 2026 so far
- 0
- Most recent grant
- 5 Jul 2011
Filings by year
| Year | Granted patents | Published applications |
|---|---|---|
| 2002 | 1 | 0 |
| 2003 | 0 | 1 |
| 2004 | 1 | 0 |
| 2005 | 0 | 1 |
| 2006 | 1 | 0 |
| 2007 | 0 | 0 |
| 2008 | 0 | 0 |
| 2009 | 1 | 2 |
| 2010 | 0 | 0 |
| 2011 | 1 | 1 |
By publication year.
Technology areas
Share of 10 documents
Recent patents
- Pile driving5 Jul 2011US 7,972,083 B2
- Method and apparatus for driving a pile into underwater substrates8 Sep 2009US 7,585,133 B2
- Pile driving system and pile for engagement with said system7 Feb 2006US 6,994,493 B2
- Pile guide15 Jun 2004US 6,749,371 B2
- Pile guide for supporting a pile as it is driven into a substrate and the method of using the same12 Mar 2002US 6,354,767 B1
- Method and Apparatus for Driving a Pile into a Substrate1 Sep 2011US 2011/0211917 A1
- Pile driving2 Jul 2009US 2009/0166092 A1
- Method and Apparatus For Driving a Pile Into Underwater Substrates21 May 2009US 2009/0129870 A1
- Pile driving system and pile for engagement with said system2 Jun 2005US 2005/0117976 A1
- Pile guide24 Apr 2003US 2003/0077127 A1
Most cited
By later US patents
- Pile guide for supporting a pile as it is driven into a substrate and the method of using the same23US 6,354,767 B12002
- Pile guide13US 6,749,371 B22004
- Pile driving system and pile for engagement with said system9US 6,994,493 B22006
- Method and apparatus for driving a pile into underwater substrates8US 7,585,133 B22009
- Pile driving7US 7,972,083 B22011