Once-through steam generator
AssigneeVogt Power International Inc.
InventorsDaniel Stark, Darryl Taylor, Anthony A. Thompson, Akber Pasha, Kelly M. Flannery
Life of this patent
Estimating the term…
Loading patent…
AssigneeVogt Power International Inc.
InventorsDaniel Stark, Darryl Taylor, Anthony A. Thompson, Akber Pasha, Kelly M. Flannery
Estimating the term…
A once-through steam generator comprises a duct having an inlet end in communication with a source of a hot gas; and a tube bundle installed in the duct and comprising multiple heat transfer tubes. The tube bundle has an economizer section, an evaporator section, and a superheater section. A steam separating device may be positioned between the evaporator section and the superheater section, wherein, as part of a wet start-up, hot water collected by the steam separating device is delivered from the steam separating device to mix with cold feedwater before it is introduced into the economizer section. A start-up module may be positioned in the duct near the inlet end, wherein, as part of a dry start-up, cold feedwater is delivered into the start-up module to generate hot water that is then mixed into the feedwater stream before it is introduced into the economizer section.
A once-through steam generator, comprising:
A method for minimizing thermal fatigue stresses in a once-through steam generator that includes a duct having an inlet end in communication with a source of a hot gas and a tube bundle installed in the duct and comprising multiple heat transfer tubes that each define a path from a top end to a bottom end, comprising the steps of:
Dependencies are inferred from the claim text.