Optimal buffer space configuration and scheduling for single-arm multi-cluster tools
AssigneeMacau University of Science and Technology
InventorsLiping Bai, Naiqi Wu, Zhiwu Li, Mengchu Zhou
Life of this patent
Estimating the term…
Loading patent…
AssigneeMacau University of Science and Technology
InventorsLiping Bai, Naiqi Wu, Zhiwu Li, Mengchu Zhou
Estimating the term…
A method for scheduling single-arm multi-cluster tools is provided. The present invention studies the scheduling problem of a single-arm multi-cluster tool with a linear topology and process-bound bottleneck individual tool. Its objective is to find a one-wafer cyclic schedule such that the lower bound of cycle time is reached by optimally configuring spaces in buffering modules that link individual cluster tools. A Petri net model is developed to describe the dynamic behavior of the system by extending resource-oriented Petri nets such that a schedule can be parameterized by robots' waiting time. Based on this model, conditions are presented under which a one-wafer cyclic schedule with lower bound of cycle time can be found. With the derived conditions, an algorithm is presented to find such a schedule and optimally configure the buffer spaces.
A computer implemented method for scheduling single-arm multi-cluster tools with optimal buffer space configuration, comprising:
A non-transitory computer-readable medium whose contents cause a computing system to perform a computer implemented method for scheduling single-arm multi-cluster tools with optimal buffer space configuration, the method comprising:
Dependencies are inferred from the claim text.