Method and a system for executing a scheduled production process
AssigneeSiemens Aktiengesellschaft
InventorPaolo Fontanot
Life of this patent
Estimating the term…
Loading patent…
AssigneeSiemens Aktiengesellschaft
InventorPaolo Fontanot
Estimating the term…
A method and a system execute a scheduled production process having an execution duration within a production schedule executed by a manufacturing execution system. The method includes defining within the production process a resource required for the execution of the production process and defining for the resource a sequence-dependent setup sub-process having a setup duration, a productive sub-process and a sequence-dependent teardown sub-process. The production process is scheduled with a start-time. At a predetermined period at the start-time of the production process, the production process for dispatching and subsequent executing is confirmed. In response to the confirmation, individual production processes are created for the sequence-dependent setup sub-process, the production sub-process and the teardown sub-process. The created individual production processes are linked together by precedence constraints defining a sequence of the created individual production processes. The production schedule is rescheduled through replacing the production process by the created individual production processes.
A method for executing a scheduled production process having an execution duration within a production schedule executed and controlled by a manufacturing execution system, which comprises the steps of:
A system for executing a scheduled production process having an execution duration within a production schedule executed and controlled by a manufacturing execution system, the system comprising:
Dependencies are inferred from the claim text.