Method for renovating of a traffic-carrying structure
AssigneeMageba S.A.
InventorsGianni Moor, Bernd Urich, Eduard Schiebelbein, Ernst-Peter Laich
Life of this patent
Estimating the term…
Loading patent…
AssigneeMageba S.A.
InventorsGianni Moor, Bernd Urich, Eduard Schiebelbein, Ernst-Peter Laich
Estimating the term…
In order to repair a bridge in the zone of an expansion joint initially at least the near-surface components of the bridging device that is to be replaced are dismounted and the existing lane structure in the zones bordering the bridging device that is to be replaced is removed in the areas facing the abutment and the superstructure so as to form recesses placed at a lower level than the lane surface, whereupon a temporary bridging element located at the ground level is removably mounted. In order to entirely dismount one section of the bridging device that is to be replaced after another and perform preparatory work for assembling a new permanent bridging device, at least the bridging plate is repeatedly removed and re-assembled as required.
A method for renovation of a traffic-carrying structure in the zone of an expansion joint existing between an abutment and a superstructure, comprising:
A method for renovation of a traffic-carrying structure in the zone of an expansion joint existing between an abutment and a superstructure, comprising:
Dependencies are inferred from the claim text.