Management apparatus, program and method for controlling data included in bill of material
AssigneeHitachi, Ltd.
InventorsShinya Yuda, Yuuji Kanbayashi, Shunsuke Minami
Life of this patent
Estimating the term…
Loading patent…
AssigneeHitachi, Ltd.
InventorsShinya Yuda, Yuuji Kanbayashi, Shunsuke Minami
Estimating the term…
A BOM is merged to a BOM stored in a BOM data base by means of the component identification judgment means that compares the product record in the BOM file with the product listed in the BOM stored in the BOM data base and makes judgment conformity between these two product records and a BOM rearrangement means that has a BOM rearrangement means a coding rule estimating means determining the coding compliance. A component assembly flag and a component assembly status flag are appended to the BOM stored in the BOM data base so that the expansion to the lower hierarchal layers of the component is presented.
A management apparatus for controlling data of bill of material (abbreviated as BOM, hereinafter), which manages plural sets of BOMs compiled by different BOM controlling schemes, comprising:
A management apparatus for controlling data of bill of material (abbreviated as BOM, hereinafter), comprising:
A management program for controlling data of bill of material (abbreviated as BOM, hereinafter) characterized by plural functions, configured in a computer including at least a processor and a memory, and a storage means, being built-in or linked to the computer, that stores a BOM data base which holds BOMs in a data base management scheme therein has the functions of:
A management method for controlling data of bill of material (abbreviated as BOM, hereinafter) characterized by the plural steps, configured in a computer including at least a processor and a memory, and a storage means, being built-in or linked to the computer, that stores a BOM data base which holds BOMs in a data base management scheme therein has the steps of:
Dependencies are inferred from the claim text.