Method for manufacturing with engineering change override
AssigneeInternational Business Machines Corporation
InventorsIvory W. Knipfer, Fraser A. Syme, Matthew H. Zemke
Life of this patent
Estimating the term…
Loading patent…
AssigneeInternational Business Machines Corporation
InventorsIvory W. Knipfer, Fraser A. Syme, Matthew H. Zemke
Estimating the term…
The illustrative embodiments provide a computer implemented method, apparatus, and computer usable program code for processing orders. A request for delivery by a requested delivery date is received for an order having an original delivery date. The ordered product is broken down into one or more materials required for manufacturing the ordered product. For at least one material required for manufacturing the ordered product, a date when an engineering change becomes effective for the material is specified. An alternate bill of materials is created based on the specified date when the engineering change becomes effective for the material. An alternate manufacturing plan based on the alternate bill of materials is created. Manufacturing is initiated based on the alternate manufacturing plan. If manufacturing can be completed in time for delivery by the requested delivery date, the original delivery date of the order is replaced with the requested delivery date.
A computer program product stored in a computer usable medium including computer usable program code when executed by a computer for processing orders, said computer program product comprising:
A data processing system for processing orders, the data processing system comprising:
Dependencies are inferred from the claim text.