Integrated system of loads with multiple public awareness functions
AssigneeRauland-Borg Corporation
InventorDilip T. Singhi
Life of this patent
Estimating the term…
Abstract
A signaling system may include two subsystems that share a common wiring backbone and provide public awareness functions. The two subsystems may be a public address system and a master/slave clock system. Remote rooms at the tail end of the wiring backbone include a speaker and a slave clock. The speakers are in communication with a control device through the wiring backbone. The slave clocks are in communication with another control device at the head end of the wiring backbone. The master/slave clock system superimposes its DC power signal and a time correction signal on the wiring backbone. Each slave clock interfaces the wiring infrastructure through a center tap of a speaker transformer which allows the slave clock to be powered and corrected via the speaker wiring infrastructure.
Claims21
A system in a building for providing public awareness functions comprising:
- a first subsystem of loads comprising a plurality of loads distributed in the building for providing a first public awareness function, where each of the plurality of loads of the first subsystem is in communication with a first control device by way of a wiring infrastructure to deliver drive signals to the loads;
- a second subsystem of loads comprising a plurality of loads distributed in the building for providing a second public awareness function;
- where each of the plurality of loads of the second subsystem is in communication with a second control device;
- the second control device including an interface for tapping into the wiring infrastructure to deliver drive signals to the plurality of loads of the second subsystem;
- and
- each of the loads of the second subsystem including an interface to the wiring infrastructure for receiving the drive signals from the second control device while ignoring the drive signals from the first control device.
In a system of a first type of loads distributed in a building for providing one or more public awareness functions, wherein the first type of loads is driven by a first control device by way of a wiring infrastructure in the building, a method for installing in the building and operating a second type of loads providing one or more public awareness functions comprising:
- tapping into a head end of the wiring infrastructure connected to the first control device in order to connect a second control device to the wiring infrastructure;
- tapping into a terminal end of the wiring infrastructure connected to at least one of the first type of loads in order to connect at least one of the second type of loads;
- delivering drive signals from the second control device to the second type of loads by way of the wiring infrastructure;
- and
- interrupting the drive signals from the second control device when drive signals from the first control device are not compatible with the drive signals from the second control device.
A system of loads distributed in a building for providing public awareness functions, the system comprising:
- a first subsystem of loads comprising a plurality of loads distributed in the building for providing a first public awareness function, where each of the plurality of loads is in communication with a first control device by way of a wiring infrastructure to provide drive signals to the loads;
- a second subsystem of loads comprising a plurality of loads distributed in the building for providing a second public awareness function;
- each of the plurality of loads of the second subsystem tapping into a terminal end of the wiring infrastructure associated with one of the plurality of loads of the first subsystem;
- a second control device of the second subsystem tapping into a head end of the wiring infrastructure for powering the loads of the second subsystem by way of wiring common to that supporting the drive signals of the first control device;
- and
- circuitry for electrically disconnecting the plurality of loads of the second subsystem from the second control device when the drive signals from the first control device are not compatible with drive signals from the second control device.
Dependencies are inferred from the claim text.