Time shift control of wastewater pumping system
AssigneeMilltronics Ltd.
InventorIan D. Van Zyl
Life of this patent
Estimating the term…
Loading patent…
AssigneeMilltronics Ltd.
InventorIan D. Van Zyl
Estimating the term…
Reservoir flow or surge control systems frequently have large installed lifting or pumping capacity to deal with variations in either inflow or outflow, or both, and may form a part of a larger system of many such reservoirs. Taken together these reservoirs may have significant storage capacity. In operation such systems are large consumers of electricity. Electricity is often priced differently at different times of day. This invention employs this storage capacity to permit energy consumption to be shifted, at least in part, from periods of high electricity prices to periods of low electricity prices. This is done by permitting a greater amount of material to collect during periods of expensive electricity, and then removing the material to a lower level during periods of less expensive electricity, or the reverse, depending on the nature of the system and the material in question. Either an `On-Off` or flow rate control method of pump control may be used. The invention is illustrated by application to a wastewater pumping system. In this case a control unit works in conjunction with a pulse-echo acoustic level sensor to control the operation of a battery of wastewater pumps at wastewater pumping stations in an urban sewage system.
In the combination of a reservoir containing fluent material, means for monitoring the level of fluent material in the reservoir, electrically powered displacement means associated with at least one of an inlet and an outlet of the reservoir for changing the level of fluent material in the reservoir in a first direction, and control means responsive to said monitoring means to initiate operation of said displacement means responsive to said monitored level moving beyond a first predetermined level in a second direction opposite to said first direction, and to terminate operation of said displacement means responsive to said monitored level moving beyond a second predetermined level in said first direction, the control means including a clock, the improvement wherein the control means further implements a selection routine controlled by the clock to select different sets of first and second predetermined levels in different predetermined periods determined by the clock in which predetermined periods the price of electricity is different, a set of levels for use in periods in which the price of electricity is higher being displaced in said second direction relative to a set of levels for use in periods in which the price of electricity is lower.
In a pumping system associated with a reservoir so as to change reservoir level in a particular direction, a method of time-shifting energy usage by the pumps including the step of controlling the pumping system to maintain a first range of reservoir levels during certain periods, and the step of controlling the pumping system to maintain a second range of reservoir levels, which is displaced further in said particular direction than said first range during intermediate periods, whereby to displace energy usage from said certain periods to said intermediate periods.
Dependencies are inferred from the claim text.