Through-tubing recirculating tool assembly for well completions
AssigneeHalliburton Company
InventorsDhirajlal C. Patel, Tommy F. Grigsby
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Company
InventorsDhirajlal C. Patel, Tommy F. Grigsby
Estimating the term…
A recirculating tool assembly is lowered on a length of coil tubing into the production tubing of a well completion to a location above side wall perforations in the production tubing which have become obstructed. The tool assembly includes an upper tool portion telescoped into and releasably latched within a lower sealing and tubing extension portion. Recirculating fluid is pumped down the coil tubing, flowed through a first tool assembly passage, and downwardly discharged into the production tubing. A portion of the discharged fluid is forced outwardly through the production tubing perforations to remove the obstructions therefrom, and the remainder of the discharged fluid is forced upwardly through a second tool assembly passage into the annulus between the coil tubing and the production tubing for return to the surface. After this recirculation process is completed the upper tool assembly portion is unlatched from the lower assembly portion, using fluid pressure within the coil tubing, and removed from the production tubing. An alternate embodiment of the tool assembly is used to form a gravel pack internally around additional perforations formed in the production tubing before the tool assembly is lowered into place therein. After the upper tool assembly portion is unlatched and removed, production fluid flows into the production tubing through these additional perforations and then flows into the lower portion of the tool assembly, through a sand screen structure carried thereon, for delivery to the surface.
A method of restoring production fluid inflow through obstructed perforations in the production tubing portion of a subterranean well completion, said method comprising the steps of:
For use in conjunction with a subterranean well completion having obstructed production fluid inlet perforations in its production tubing portion, a method of restoring production fluid inflow into the production tubing, said method comprising the steps of:
A recirculating tool assembly for use in restoring production fluid flow into a subterranean well completion production tubing structure having obstructed production fluid inlet perforations, said recirculating tool assembly being lowerable into the production tubing structure, on an end of tubing means having an outer diameter less than the inner diameter of the production tubing structure, to a predetermined position therein relative to the obstructed inlet perforations, said recirculating tool assembly comprising:
A recirculating tool assembly for use in restoring production fluid flow into a subterranean well completion production tubing structure having obstructed production fluid inlet perforations, said recirculating tool assembly being lowerable into the production tubing structure, on an end of tubing means having an outer diameter less than the inner diameter of the production tubing structure, to a predetermined position therein relative to the obstructed inlet perforations, said recirculating tool assembly comprising:
Dependencies are inferred from the claim text.