Leadframe silver bleed elimination
AssigneeMotorola, Inc.
InventorBrian A. Webb
Life of this patent
Estimating the term…
Abstract
A method of making a leadframe useful in packaging semiconductor devices eliminates silver bleed between adjacent leads of the leadframe. This is accomplished by leaving excess leadframe material along the edges of the leads prior to silver plating the flag area and the portion of the leads adjacent to the flag area. After the plating operation, this excess leadframe material is removed thereby leaving silver free leads which will be exposed outside of a resulting encapsulated semiconductor package.
Claims4
A method to eliminate silver bleed on a leadframe having a flag area, a plurality of leads extending from adjacent the flag area, and a dam bar tieing the leads together a predetermined distance from the flat area, comprising the following steps:
- providing material to form the leadframe;
- forming the leadframe including leaving leadframe material along edges of the leads adjacent the dam bar on the flag area side of the dam bar to receive any silver bleed;
- plating the leads between the dam bar and the flag area with silver;
- and removing the leadframe material left along edges of the leads.
A method to eliminate plating material bleed in a leadframe assembly useful in packaging semiconductor devices and having a plurality of flag areas and a plurality of leads associated with each flat area, a dam bar made from leadframe material interconnects the plurality of leads and is located a short distance from the flag area, comprising the following method:
- providing material to form the leadframe;
- forming the leadframe including leaving leadframe material along edges of the leads adjacent to and in contact with the dam bar toward the flag area;
- selectively plating the leadframe including the material left along the edges of the leads;
- and removing the material left along the edges of the leads thereby providing a leadframe void of plating material along the edges of the leads near the dam bar to eliminate bleeding between the leads.
Dependencies are inferred from the claim text.