Procedure for complete replacement of a steam generator of a pressurized water nuclear reactor
AssigneeFramatome
InventorAlain Martin
Life of this patent
Estimating the term…
Loading patent…
AssigneeFramatome
InventorAlain Martin
Estimating the term…
The method consists in separating the worn-out steam generator (1) from the primary circuit, by sectioning the pipes (3, 5) in the vicinity of the steam generator pipework, withdrawing the worn-out steam generator, placing a replacement steam generator in position and welding the pipe work of the replacement steam generator to the primary pipes (3, 5). Topometric measurements are carried out on the replacement generator, on the worn-out steam generator (1) in position in its compartment (11) and in the compartment (11) after the removal of the worn-out generator (1). Comparison of the topometric measurements enables the replacement procedure to be determined, i.e., the number of cuts to be made on the primary pipes (3, 5), the modifications to be made to the supporting and positioning devices (8, 17) and the position of the chamfers for welding the pipes (3, 5) and the pipework of the replacement steam generator.
In a method for the complete replacement of a worn-out steam generator (1) of a pressurized water nuclear reactor comprising a reactor building (10) defining a compartment (11) in which the steam generator (1) is retained in a specified position by means of supporting and positioning devices (8, 17) placed in said compartment, and a primary circuit (3, 4, 5) in said reactor building (10) in which primary circuit pressurized water circulates, said primary circuit comprising two pipes (3,5) connected to a lower part of said worn-out steam generator (1) in the region of corresponding nozzles of said worn-out steam generator, said method comprising the steps of separating said worn-out steam generator (1) from said primary circuit by sectioning said pipes (3, 5) in the vicinity of pipework of said worn-out steam generator (1), withdrawing said worn-out steam generator from said compartment (11), placing a replacement steam generator (20) in position in said compartment (11) and welding the nozzles (22a, 22b) of said replacement steam generator to said pipes (3, 5), in the region of welding chamfers, the improvement comprising the steps of
Dependencies are inferred from the claim text.