Method of constructing an artificial island and island constructed by the same
AssigneesBallast-Nedam Groep N.V., Amsterdamse Ballast Bagger en Grond (Amsterdam Ballast Dredging) B.V.
InventorsJan Op den Velde, Jan B. Elzerman, Klaas Oterdoom
Life of this patent
Estimating the term…
Abstract
An artificial island is constructed by depositing material such as sand, y or the like on the building site on the bottom and by providing inhibiting means formed by branched, relatively spaced elements positioned on the building site, to reduce the rate of effluence of the material such as sand, clay or the like along the sea bottom.
Claims5
A method of constructing an artificial island by depositing material such as sand, clay or the like on the buildiing site on an under water bottom and by providing inhibiting means formed by branched elements positioned on the building site for reducing the rate of effluence of the material such as sand, clay or the like along the under water bottom, wherein before lowering the branched elements, at least some of said branched elements are weighted with a load adjacent their bottom ends, characterized in that in a step (a) the loaded branched elements are dumped in a standing position from a floating barge onto the under water bottom and that in a subsequent step (b) the material is dumped over said branched elements.
The method of constructing an earth mass from the bottom up, particularly in the open sea, with a minimum amount of material, which comprises the steps of:
- (a) forming a predetermined array of weighted, branched elements on the sea bottom by dumping such weighted elements overboard at sea level in conformity with such array, said predetermined array being of sufficiently small area as to require a minimum amount of material for the construction;
- (b) dredging spoil from the sea bottom at a site remote from said array and discharging such spoil to settle downwardly within the area encompassing said array whereby there is minimal spreading of spoil beyond the confines of the array;
- (c) forming a further array of weighted, branched elements on the spoil deposited in step (b) by dumping such weighted elements overboard at sea level in conformity with such further array, said further array having a boundary just inside the boundary of the previous array;
- (d) dredging more spoil as in step (b) and discharging it onto the array of step (c);
- and
- (e) repeating steps (c) and (d) until the construction reaches a desired level.
Dependencies are inferred from the claim text.