The construction for the installation of the Cascading Hydroelectric Power Plant in the very bed of the river was solved as follows: A base plate (6) is provided, on which the sill (7) is built. On both sides, a wall (4) is placed on the plate (6) and the threshold (7) for the fixed position of the Hydro Wing (8) and the arch (9) with the grid (10). This is how the difference in the height (17) of the water with the position of the Hydro Wing (8), under which the water (2) flows for the needs of the operation of the blades (15) of the turbine, is formed. The blades (15) of the turbine rotate around the Hydro Wings (8), arranged by the position of chains (29), guides (30) and rollers (31). The chain (29) rotates with the paddles (15) at the position of the sprocket (28) with the housings. Sensors (25) monitor the water level when the Hydro Turbine is automatically started or stopped with the help of the described assembly, when the vane (15) also serves as a valve (24) to stop the water flow. Everything needed for the production of electricity.
The construction for the Cascade Hydroelectric Power Plant should contain:
Where the Hydroelectric Plant is placed in the mother of the river with the shape of the Latin letter “S”, it is connected to the coast by barriers (43) that control high water (2), and where the entire length of the Hydroelectric Plant is used as an overflow (16) for flood protection.
Where the construction of the Cascade Hydroelectric Power Plant is adjusted for the needs of using tides and sections in the production of electricity.