A method of operating a wind power plant (12) comprising a group of wind turbines (14) 5 including at least one wind turbine designated as a verification turbine (14a) and at least one wind turbine designated as a non-verification turbine (14b). The method comprises: operating the or each verification turbine (14a) to produce a maximised output; and operating the or each non-verification turbine (14b) to produce an output that is controlled in accordance with the output of the or each verification turbine (14a), so that a combined 10 output of the group of wind turbines (14) aligns with a target power plant output.
A method of operating a wind power plant comprising a group of wind turbines including at least one wind turbine designated as a verification turbine and at least one wind turbine designated as a non-verification turbine the method comprising:
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
(canceled)
A power plant controller, comprising: