Projection welded joint and method of producing same
AssigneeJfe Steel Corporation
InventorsReiko ENDO, Daiki YAMAGISHI, Katsutoshi TAKASHIMA
Life of this patent
Estimating the term…
Abstract
Provided are a projection welded joint with improved peeling strength and delayed fracture resistance, and a method for producing the same. The projection welded joint has a steel sheet and a nut, in which the steel sheet has a predetermined chemical composition, and the minimum hardness Hva (HV) of region a and the base metal hardness Hvm (HV) of the steel sheet satisfies Hva/Hvm≤0.90. Region a is defined in the description.
Claims2
A projection welded joint in which a steel sheet and a nut having a projection are projection welded to each other via the projection,
- wherein the steel sheet comprises a chemical composition containing, in mass %,
- C:
- 0.05% or more and 0.50% or less,
- Si:
- 0.1% or more and 2.0% or less,
- Mn:
- 1.5% or more and 4.0% or less,
- P:
- 0.10% or less,
- S:
- 0.005% or less,
- N:
- 0.010% or less, and
- O:
- 0.030% or less,
- and further optionally containing at least one element selected from the group consisting of
- Al:
- 2.00% or less,
- B:
- 0.0050% or less,
- Ca:
- 0.005% or less,
- Cr:
- 1.00% or less,
- Cu:
- 0.80% or less,
- Ni:
- 1.00% or less,
- Mo:
- 1.00% or less,
- Ti:
- 0.200% or less,
- V:
- 0.500% or less,
- Nb:
- 0.080% or less,
- Sb:
- 0.200% or less, and
- Sn:
- 0.200% or less, with the balance being Fe and inevitable impurities, and
- a minimum hardness Hva (HV) of region a according to the definitions below in the steel sheet and a base metal hardness Hvm (HV) of the steel sheet satisfy Equation (1) below:
- H
-
- v
-
- a
- /
- H
-
- v
-
- m
- ≤
- 0
- .
- 9
-
- 0
- (
- 1
- )
- in which region a above is defined below based on a cross-section including a center axis of the nut and passing through a center of a joint between the steel sheet and the nut, of the projection welded joint:
- with an end point on an inner peripheral side of the nut in contact with the steel sheet being defined as point A, and an end point on an outer peripheral side of the nut in contact with the steel sheet being defined as point B, a length of a line segment connecting points A and B being defined as 2L, a point located on the line segment at a distance of L/2 from point B toward point A being defined as point C1, a point located on a line formed by a surface of the steel sheet continuous with the line segment, at a distance of L from point B, being defined as point C2, a point located inside the steel sheet at a depth of 0.80 mm in a sheet thickness direction from point C2 being defined as point C3, and a point located inside the steel sheet at a depth of 0.80 mm in the sheet thickness direction from point C1 being defined as point C4, an internal region of a rectangle formed by connecting points C1, C2, C3, and C4 is defined as region a.
A method for producing a projection welded joint by projection welding a steel sheet and a nut having a projection to each other via the projection,
- wherein the steel sheet comprises a chemical composition containing, in mass %,
- C:
- 0.05% or more and 0.50% or less,
- Si:
- 0.1% or more and 2.0% or less,
- Mn:
- 1.5% or more and 4.0% or less,
- P:
- 0.10% or less,
- S:
- 0.005% or less,
- N:
- 0.010% or less, and
- O:
- 0.030% or less,
- and further optionally containing at least one element selected from the group consisting of
- Al:
- 2.00% or less,
- B:
- 0.0050% or less,
- Ca:
- 0.005% or less,
- Cr:
- 1.00% or less,
- Cu:
- 0.80% or less,
- Ni:
- 1.00% or less,
- Mo:
- 1.00% or less,
- Ti:
- 0.200% or less,
- V:
- 0.500% or less,
- Nb:
- 0.080% or less,
- Sb:
- 0.200% or less, and
- Sn:
- 0.200% or less, with the balance being Fe and inevitable impurities, and
- the projection welding has:
- a main current application step in which current is applied at a current value I1 (kA) for a welding time t1 (ms) to form a joint between the steel sheet and the nut;
- a first non-current application step in which a non-current period having a non-welding time tc1 (ms) satisfying Equation (2) below is provided;
- a first subsequent-current application step in which current is applied at a current value I2 (kA) satisfying Equation (3) below for a welding time t2 (ms) satisfying Equation (4) below;
- and
- further optionally,
- a second non-current application step in which a non-current period having a non-welding time tc2 (ms) satisfying Equation (5) below is provided, followed by a second subsequent-current application step in which current is applied at a current value I3 (kA) satisfying Equation (6) below for a welding time t3 (ms) satisfying Equation (7) below:
- 1
-
- 0
- ≤
- t
- c
-
- 1
- ≤
- 300
- (
- 2
- )
- I
- 1
- ≤
- I
- 2
- ≤
- 3
- .
- 0
-
- 0
-
- I
- 1
- (
- 3
- )
- 30
- ≤
- t
- 2
- ≤
- 300
- (
- 4
- )
- 0
- <
- t
- c
-
- 2
- ≤
- 400
- (
- 5
- )
- 0.7
- I
- 2
- ≤
- I
- 3
- ≤
- 1
- .
- 3
-
- 0
-
- I
- 2
- (
- 6
- )
- 0
- <
- t
- 3
- ≤
- 300.
- (
- 7
- )
Dependencies are inferred from the claim text.