Ground-hole-tunnel combined fine detection method and system
AssigneeShandong University
InventorsBin LIU, Lei CHEN, Yuxiao REN, Xinji XU, Yang ZZHAO, Zhongzhi LI
Life of this patent
Estimating the term…
Loading patent…
AssigneeShandong University
InventorsBin LIU, Lei CHEN, Yuxiao REN, Xinji XU, Yang ZZHAO, Zhongzhi LI
Estimating the term…
A ground-borehole-tunnel combined fine detection method and system, wherein the fine detection method comprises: configuring an ground-borehole-tunnel combined observation mode for tunnel boring machine (TBM) rock-breaking seismic source detection, and carrying out time synchronization and spatial positioning; synchronously acquiring and storing signals by a ground-borehole-tunnel combined detection device when the TBM starts to work; processing parameters in the tunneling process of the TBM and data acquired by a receiving station array to obtain a velocity model and a seismic section of areas in front of and around the tunnel after completing data acquisition; and determining geological conditions of rock masses in front of a working face of the TBM and around the tunnel, based on the obtained velocity model and the seismic section, in combination with the spatial distribution of excavated rock strength indexes and geological drilling data, to realize advanced prediction of geological anomalies.
A ground-borehole-tunnel combined fine detection method, comprising:
5-6. (canceled)
A ground-borehole-tunnel combined fine detection system, comprising:
Dependencies are inferred from the claim text.