Hybrid approach to predictive corrosion/erosion for tubular integrity management
AssigneeLandmark Graphics Corporation
InventorsYogesh Bansal, Rachit Kedia, Ghazanfar Shahid, Christophe Abdon Van Laer
Life of this patent
Estimating the term…
Loading patent…
AssigneeLandmark Graphics Corporation
InventorsYogesh Bansal, Rachit Kedia, Ghazanfar Shahid, Christophe Abdon Van Laer
Estimating the term…
A method for managing integrity of a tubular comprises obtaining fluid transportation system data, wherein the tubular is a component within a fluid transportation system. The method comprises determining, via a mechanistic model, a mechanistic corrosion rate of the tubular based on the fluid transportation system data. The method comprises determining, via a learning machine, a residual corrosion rate of the tubular based on the fluid transportation system data. The method comprises determining, via a hybrid model, a final corrosion rate of the tubular based on the mechanistic corrosion rate and the residual corrosion rate.
A method for managing integrity of a tubular comprising:
A system comprising:
A non-transitory, computer-readable medium having instructions stored thereon that are executable by a processor, the instructions comprising:
Dependencies are inferred from the claim text.