Controlling resistance in well system
AssigneeHalliburton Energy Services, Inc.
InventorsDinesh Ananda Shetty, Erik Lee
Life of this patent
Estimating the term…
Loading patent…
AssigneeHalliburton Energy Services, Inc.
InventorsDinesh Ananda Shetty, Erik Lee
Estimating the term…
A method for determining a new factor vector for a first hydraulic fracture treatment in a wellbore. The method may include determining, based on one or more first pressure pulses, a first current resistance in the well during the first hydraulic fracture treatment; determining a second factor vector based, at least in part, on a first factor vector and the first current resistance and a target resistance; implementing the second factor vector in the wellbore; determining, based on one or more second pressure pulses, a second current resistance in the well during the first hydraulic fracture treatment; determining whether the second current resistance is above a resistance threshold; and in response to the second current resistance being above the resistance threshold, determining a third factor vector.
A method for determining a new factor vector for a first hydraulic fracture treatment in a wellbore, the method comprising:
One or more non-transitory computer-readable mediums including instructions that, when executed by a processor, perform operations for determining a new factor vector for a first hydraulic fracture treatment in a wellbore, the instructions comprising:
A computer system comprising:
Dependencies are inferred from the claim text.