Back to results
US 2025/0369333 A1Published application
Systems and methods for hydrogen production from an underground formation
AssigneeSaudi Arabian Oil Company
InventorsHarun Ates, Ravimadhav N. Vaidya
Life of this patent
Estimating the term…
Abstract
The disclosure relates to systems and methods for hydrogen production from an underground formation by providing heat to a first set of fractures to convert a hydrocarbon (e.g., methane, ethane, propane) present in the underground formation into hydrogen and producing the hydrogen from a second set of fractures.
Claims23
A method, comprising:
- a) forming a first set of fractures in an underground formation and a second set of fractures in the underground formation by injecting a mixture comprising a proppant and a catalyst into a wellbore in the underground formation, the first set of fractures being different from the second set of fractures, the first set of fractures comprising a hydrocarbon;
- b) after a), heating the first set of fractures, thereby converting at least a portion of the hydrocarbon present in the first set of fractures into hydrogen;
- c) after b), allowing at least a portion of the hydrogen to enter the second set of fractures;
- and
- d) after c), producing a stream from a production tube, the stream passing from the second set of fractures then to the production tube, the stream comprising the hydrogen from the second set of fractures.
2 more elements
(canceled)
A system, comprising:
- an injection tube extending into an underground formation, the injection tube comprising perforations so that an interior of the injection tube is in fluid communication with a first set of fractures in the underground formation;
- a heat source configured to heat the first set of fractures to convert a hydrocarbon present in the first set of fractures into hydrogen;
- a production tube extending into the underground formation, the production tube comprising perforations so that an interior of the production tube is in fluid communication with a second set of fractures different from the first set of fractures, the production tube configured to produce a stream, the stream passing from the second set of fractures to the production tube via the perforations in the production tube, the stream comprising hydrogen from the second set of fractures that passed from the first set of fractures to the second set of fractures;
- and
- packers configured to prevent fluid communication between the first set of fractures and the second set of fractures.
2 more elements
(canceled)
-19. (canceled)
Dependencies are inferred from the claim text.