Process line changeover
AssigneeSwimc LLC
InventorsWilliam C. Upton, Richard D. Hudson, Erin H. Jayjack, Anthony B. Sharrotta, Flavio Lacerda
Life of this patent
Estimating the term…
Loading patent…
AssigneeSwimc LLC
InventorsWilliam C. Upton, Richard D. Hudson, Erin H. Jayjack, Anthony B. Sharrotta, Flavio Lacerda
Estimating the term…
Described herein are methods for performing changover of a production line from a first product to a second product. One method involves assigning changover codes to the first product and second product and determining a wash type for the changover. A second method involves receiving a plurality of batch production orders for a plurality of products. Wash types for different sequences of the batch production orders are determined and a sequence is selected that reduces the amount of time for washing the line during changeovers. A third method involves transferring a product to a fill station prior to receiving quality control test results. The product is held at the fill station prior to the receipt of the test results. If the product passes the quality control test then the product is distributed by the fill station; otherwise, the product fails the quality control test, the product is quarantined.
A method, comprising:
An apparatus, comprising:
An apparatus, further comprising:
An apparatus, comprising:
Dependencies are inferred from the claim text.