Systems and methods for lng refrigeration and liquefaction
AssigneeFluor Technologies Corporation
InventorsJohn MAK, Jacob THOMAS
Life of this patent
Estimating the term…
Abstract
A LNG liquefaction plant system includes concurrent power production, wherein the refrigeration content of the refrigerant or SMR is used to liquefy and sub-cool a natural gas stream in a cold box or cryogenic exchanger. For concurrent power production, the system uses waste heat from refrigerant compression to vaporize and superheat a waste heat working fluid that in turn drives a compressor for refrigerant compression. The refrigerant may be an external SMR or an internal LNG refrigerant working fluid expanded and compressed by a twin compander arrangement.
Claims20
A plant for LNG liquefaction, the plant comprising:
- a natural gas feed stream;
- a heat exchanger;
- a first expander;
- a first refrigerant compressor;
- a second expander,
- wherein the plant is configured such that the heat exchanger provides heat exchange between the natural gas feed stream and a compressed and cooled refrigerant stream to heat the compressed and cooled refrigerant stream,
- wherein the plant is configured such that, after the heat exchange in the heat exchanger, the compressed and cooled refrigerant stream is split into a first refrigerant portion and a second refrigerant portion,
- wherein the plant is configured such that the heat exchanger uses the second refrigerant portion to cool the natural gas feed stream,
- wherein the second refrigerant portion is heated in the heat exchanger to produce a warmed refrigerant stream,
- wherein the plant is configured such that the first expander expands the first refrigerant portion to produce an expanded first refrigerant stream portion,
- wherein the plant is configured such that the heat exchanger uses the expanded first refrigerant stream portion to cool the natural gas feed stream,
- wherein the expanded first refrigerant stream portion is heated in the heat exchanger to produce a first warm LNG vapor stream,
- wherein the plant is configured such that the first refrigerant compressor compresses the first warm LNG vapor stream,
- wherein the plant is configured such that the warmed refrigerant stream is expanded to produce an expanded second refrigerant stream portion,
- wherein the plant is configured such that the heat exchanger uses the expanded second refrigerant stream portion, and
- wherein the expanded second refrigerant stream portion is heated in the heat exchanger to produce a second warm LNG vapor stream.
Dependencies are inferred from the claim text.