Back to results
US 2025/0208684 A1Published application
Cellular network having energy load shifting
AssigneeTalkingHeads Wireless, Inc.
InventorJohn E. DeRoo
Life of this patent
Estimating the term…
Abstract
Methods and apparatus for load shifting power supply for a cellular network system. In embodiments, an energy controller can provision a battery backup to supply power to the system for X number of hours, and load shift power to the system between mains power and the battery backup based on one or more characteristics of the mains power. In some embodiments, the one or more characteristics of the mains power includes a cost schedule having on-peak and off-peak rates.
Claims20
A cellular network system, comprising:
- an energy controller having a processor and memory configured to:
- provision a battery backup to supply power to the system for X number of hours;
- and
- load shift power to the system between mains power and the battery backup based on one or more characteristics of the mains power.
1 more element
A method, comprising:
- in a cellular network system, employing an energy controller for:
- provisioning a battery backup to supply power to the system for X number of hours;
- and
- load shifting power to the system between mains power and the battery backup based on one or more characteristics of the mains power.
1 more element
Dependencies are inferred from the claim text.