Automated rightsizing of containerized application with optimized horizontal scaling
AssigneeGram Labs, Inc.
InventorsBradley Joseph BEAM, Jeremy Michael GUSTIE, Christopher Marc LARSON, Thibaut Xavier PEROL, John Daniel PLATT
Life of this patent
Estimating the term…
Abstract
A method for rightsizing an application, including analyzing, via processing circuitry, metrics from containers; determining, via the processing circuitry, a resource allocation and a target resource utilization for an application workload based on the metrics; and configuring, via the processing circuitry, the application workload based on the resource allocation, the target resource utilization, and the metrics.
Claims18
A method for rightsizing an application, comprising:
- analyzing, via processing circuitry, one or more metrics from containers in the application;
- determining, via the processing circuitry, a resource allocation and a target resource utilization corresponding to an application workload of the application based on the one or more metrics;
- and
- configuring, via the processing circuitry, the application workload based on the resource allocation, the target resource utilization, and the one or more metrics.
A device comprising:
- processing circuitry configured to:
- analyze one or more metrics from containers in an application,
- determine a resource allocation and a target resource utilization corresponding to an application workload of the application based on the one or more metrics, and
- configure the application workload based on the resource allocation, the target resource utilization, and the one or more metrics.
A non-transitory computer-readable storage medium for storing computer-readable instructions that, when executed by a computer, cause the computer to perform a method, the method comprising:
- analyzing one or more metrics from containers in an application;
- determining a resource allocation and a target resource utilization corresponding to an application workload of the application based on the one or more metrics;
- and
- configuring the application workload based on the resource allocation, the target resource utilization, and the one or more metrics.
Dependencies are inferred from the claim text.