Method for build separation from a curing interface in an additive manufacturing process
AssigneeStratasys, Inc.
InventorsChristopher Prucha, Joel Ong
Life of this patent
Estimating the term…
Abstract
A layer-by layer method for additive manufacturing that includes: photocuring a first volume of resin to form a layer of a build at an upper surface of a separation membrane laminated over a build window; injecting a fluid into an interstitial region between the separation membrane and the build window; retracting the build from the build window; evacuating the fluid from the interstitial region; and photocuring a second volume of liquid resin to form a subsequent layer of the build between an upper surface of a separation membrane and the previous layer of the build.
Claims20
A method for additive manufacturing comprising:
- during a first advancement phase, advancing a build platform toward a separation membrane laminated over a build window;
- during a first exposure phase, curing a first volume of a resin to form a first layer of a build against an outer surface of the separation membrane, the first layer of the build coupled to the build platform opposite the separation membrane;
- during a first pressurization phase, injecting a fluid into an interstitial region between the separation membrane and the build window, at a first injection rate based on a first geometry of the first layer, to inflate the separation membrane above the build window;
- during a first retraction phase, retracting the build platform from the build window;
- during a first relamination phase, evacuating the fluid from the interstitial region to relaminate the separation membrane to the build window following separation of the separation membrane from the first layer of the build;
- during a second advancement phase, advancing the build platform toward the separation membrane;
- and
- during a second exposure phase, curing a second volume of the resin to form a second layer of the build between the outer surface of the separation membrane and the first layer of the build.
A method comprising:
- during a first advancement phase, advancing a build platform toward a separation membrane laminated over a build window;
- during a first exposure phase, curing a first volume of a resin to form a first layer of a build against an outer surface of the separation membrane, the first layer of the build coupled to the build platform opposite the separation membrane;
- during a first pressurization phase, injecting a fluid into an interstitial region between the separation membrane and the build window, at a first injection rate based on a geometry of the build, to inflate the separation membrane;
- during a first retraction phase, retracting the build platform from the build window;
- and
- during a first relamination phase, evacuating the fluid from the interstitial region to relaminate the separation membrane to the build window following separation of the separation membrane from the first layer of the build.
A method for additive manufacturing comprising:
- curing a first volume of a resin to form a first layer of a build against an outer surface of a separation membrane laminated over a build window, the first layer of the build coupled to a build platform opposite the separation membrane;
- inflating an interstitial region between the separation membrane and the build window to delaminate the separation membrane from the build window;
- retracting the first layer of the build from the build window at a first retraction rate based on a first geometry of the first layer, the first geometry representing characteristics of features within the first layer of the build;
- and
- laminating the separation membrane to the build window by depressurizing the interstitial region following separation of the separation membrane from the first layer of the build.
Dependencies are inferred from the claim text.