Construction Zone Determining Method and Construction Zone Determining Device
AssigneeNissan Motor Co., Ltd.
InventorsMasahiro Okawara, Yasuhisa Taira, Kazuyuki Uwabo
Life of this patent
Estimating the term…
Loading patent…
AssigneeNissan Motor Co., Ltd.
InventorsMasahiro Okawara, Yasuhisa Taira, Kazuyuki Uwabo
Estimating the term…
A processor determines whether a construction related item has been detected or not ahead of a subject vehicle based on vehicle surrounding information obtained by a sensor and determines that a point separated by a predetermined distance ahead of the subject vehicle from the construction related item is an end point of the road construction section when determining that the construction related item has been detected. The predetermined distance when the construction related item is detected and another vehicle is not detected around the detected construction related item is shorter than the predetermined distance when the construction related item is detected and the other vehicle is detected around the detected construction related item.
A construction section determination method comprising determining, executed by a processor, a road construction section in which a construction related item for traffic regulation is disposed while a subject vehicle is traveling, wherein the processor:
A construction section determination device comprising a processor which determines a road construction section in which a construction related item for traffic regulation is disposed while a subject vehicle is traveling, wherein the processor is configured to:
Dependencies are inferred from the claim text.