Method for generating prediction model for supply lead time of parts
AssigneeVMS Solutions Co. Ltd.
InventorsSeock Kyu YOO, Cherl Hong PARK, KyungSik LEE, SungWon HONG, HoJin JUNG
Life of this patent
Estimating the term…
Loading patent…
AssigneeVMS Solutions Co. Ltd.
InventorsSeock Kyu YOO, Cherl Hong PARK, KyungSik LEE, SungWon HONG, HoJin JUNG
Estimating the term…
Provided is a method for generating a lead time prediction model including: receiving input data from a user; identifying a final part corresponding to the input data; identifying one or more components that constitute the final part; classifying the identified one or more components into in-house production parts, which are produced in-house, and ordered parts, which are procured from suppliers; determining a lead time for the in-house production parts; obtaining first data including at least price data and historical lead time data, for each of the ordered parts; generating a model for generating a predicted lead time for at least one of the final part and the ordered parts, based on the obtained first data; and optimizing the model based on at least one of fixed costs, inventory costs, ordering costs, backlog costs, and demand loss costs.
A method for implementing a model for generating a predicted lead time, comprising:
A non-transitory computer-readable recording medium, wherein the non-transitory computer-readable recording medium comprises computer-executable instructions, and
Dependencies are inferred from the claim text.