US 2025/0146269 A1Published application
Construction evaluation and production system and methods of use therefor
AssigneeResia IP Holding, LLC
InventorsErnesto Lopes, Selma Rabelo
Life of this patent
Estimating the term…
Abstract
A construction evaluation and production system and methods of use therefor are disclosed. The method can create test fits for site plans for parcels of land and floor plans for one or more buildings. The method utilizes a plurality of building blocks, which are poured in concrete using metal forms, and prefabricated structures that can be easily transported into the building blocks to facilitate construction of apartment units and common areas comprising such building blocks. The method enables efficient and accelerated construction.
Claims10
A method of building construction comprising:
- selecting a parcel of land;
- creating a site plan for one or more buildings on the parcel of land by generating a test-fit of the location, footprint, and number of floors of the one or more buildings;
- creating a floor plan for the one or more buildings comprised of at least a first building block and a second building block, wherein each said building block comprises at least one apartment and at least one common area;
- providing a first prefabricated structure comprising a plumbing or electrical component for the first building block;
- providing a second prefabricated structure comprising a plumbing or electrical component for the second building block;
- providing a first metal form corresponding to the first building block at a location corresponding to the first building block on the site plan and the floor plan;
- pouring concrete in the first metal form to create the first building block on site;
- removing the first metal form;
- transporting the first prefabricated structure through an opening in the first building block and into a location corresponding to the floor plan;
- connecting the plumbing or electrical component of the first prefabricated structure to a plumbing or electrical component of the first building block on site;
- providing a second metal form corresponding to the second building block at a location corresponding to the second building block on the site plan and floor plan;
- pouring concrete in the second metal form to create the second building block;
- removing the second metal form;
- transporting the second prefabricated structure through an opening in the second building block and into a location corresponding to the floor plan;
- and
- connecting the plumbing or electrical component of the second prefabricated structure to a plumbing or electrical component of the second building block on site.
13 more elements
Dependencies are inferred from the claim text.