System and method for optimizing ramp operations of a hub based on a dual-stream resource optimization
AssigneeBNSF Railway Company
InventorsDasaradh R. Mallampati, Vishal Badyal, Paul Kuhn, April Y. Kuo
Life of this patent
Estimating the term…
Loading patent…
AssigneeBNSF Railway Company
InventorsDasaradh R. Mallampati, Vishal Badyal, Paul Kuhn, April Y. Kuo
Estimating the term…
Systems and techniques for optimizing ramp operations of a hub based on a dual-stream resource optimization (DSRO). In embodiments, inbound and outbound trains scheduled to arrive at or depart from a hub over a planning horizon are identified. A set of candidate track-train assignment sequences involving the inbound and outbound trains and production tracks of the hub facility is generated. Infeasible candidate track-train assignment sequences are eliminated from the set. A cost associated with each remaining candidate track-train assignment sequence over the planning horizon is determined based on one or more effort matrices. An optimized track-train assignment sequence is selected from the set of candidate track-train assignment sequences based on the determined cost. A control signal is automatically sent to a controller to cause execution of the optimized track-train assignment sequence.
A method for optimizing ramp operations in a hub facility, the method comprising:
A system configured for optimizing ramp operations in a hub facility, comprising:
A computer-based tool for optimizing ramp operations in a hub facility, the computer-based tool including non-transitory computer readable media having stored thereon computer code which, when executed by a processor, causes a computing device to perform operations comprising:
Dependencies are inferred from the claim text.