A method for planning production in a production plant (1) comprising a plurality of separate, successive plant parts (2), wherein products (P1, P2, P3, P4, P5) to be manufactured in the production plant (1) are available in a production list (3) and production sub-lists (4) are available for the separate, successive plant parts (2) or are established from the production list (3), comprising:
- analyzing the production sub-lists (4) and determining production sequences for relevant plant parts (2),
- wherein those of the products (P1, P2, P3, P4, P5) that can be manufactured in the relevant plant parts (2) without restricting or interrupting production are combined in each of the production sequences, and
- analyzing the production sequences of the plant parts (2) and determining at least one overall production sequence for the production plant (1),
- wherein an overall production sequence includes those products (P1, P2, P3, P4, P5) that include all plant parts (2) in a joint production sequence.