Battery performance evaluation device and battery performance evaluation method
AssigneeToyo System Co., Ltd.
InventorsIchiro MUNAKATA, Shuntaro IGARI, Satoshi TANNO, Hideki SHOJI
Life of this patent
Estimating the term…
Loading patent…
AssigneeToyo System Co., Ltd.
InventorsIchiro MUNAKATA, Shuntaro IGARI, Satoshi TANNO, Hideki SHOJI
Estimating the term…
A first degree of deterioration is evaluated based on a first initial index value and a first present index value. The first initial index value is a value based on a difference in initial battery capacity of a target secondary battery between a start time and an end time of a specified period including a period during which a current flows through the target secondary battery. The difference in initial battery capacity is a value determined as an output of a first initial characteristic model by inputting, to the first initial characteristic model, open-circuit voltages at the start time and the end time, respectively, of the specified period. The degree of deterioration of the target secondary battery is evaluated from the ratio of a difference in present battery capacity between the start time and the end time of the specified period with respect to the difference in initial battery capacity.
1-9. (canceled)
A battery performance evaluation device comprising:
A battery performance evaluation method, comprising:
Dependencies are inferred from the claim text.