Generator power peak limiting in virtual synchronous machine wind turbine
AssigneeVestas Wind Systems A/S
InventorsTorsten LUND, John Godsk NIELSEN, Esmaeil EBRAHIMZADEHVESHAREH
Life of this patent
Estimating the term…
Loading patent…
AssigneeVestas Wind Systems A/S
InventorsTorsten LUND, John Godsk NIELSEN, Esmaeil EBRAHIMZADEHVESHAREH
Estimating the term…
Limiting generator loads in a wind turbine having a power converter with a line side inverter configured as a grid forming inverter. A maximum grid current value is determined based on a measured generator load and a limit function. A virtual impedance value and a virtual voltage drop over the virtual impedance value are determined. A virtual synchronous machine angle is determined based on a power reference and the virtual grid power. The voltage reference for controlling the line side inverter is determined based on the virtual synchronous machine angle, the virtual voltage drop and the voltage magnitude reference.
A method for limiting generator loads in a wind turbine comprising a power converter with a line side inverter arranged to supply power to a power grid, the method comprising:
A wind turbine control system arranged for limiting generator loads in a wind turbine comprising a power converter with a line side inverter arranged to supply power to a power grid, the wind turbine control system is arranged to perform an operation for limiting generator loads in the wind turbine, the operation comprising:
(canceled)
A wind turbine, comprising:
Dependencies are inferred from the claim text.