Method and system for controlling a production system
AssigneeSiemens Aktiengesellschaft
InventorsStefan Depeweg, Kai Heesche, Markus Kaiser
Life of this patent
Estimating the term…
Loading patent…
AssigneeSiemens Aktiengesellschaft
InventorsStefan Depeweg, Kai Heesche, Markus Kaiser
Estimating the term…
A plurality of test data sets include: a first design data set specifying a design variant of a product; and first target values, which quantify target variables of the design variant which are to be optimized and ranked. Furthermore, a plurality of design evaluation modules for predicting target values on the basis of design data sets is provided. For each of the design evaluation modules, a second ranking of the first design data sets with respect to the predicted target values and a deviation of the second ranking from the first ranking are then determined. One design evaluation module is then selected in accordance with the determined deviations. Furthermore, a plurality of second design data sets is generated, and are predicted by the selected design evaluation module. A target-value-optimized design data set is then derived from the second design data sets and is output for the manufacturing of the product.
A computer-implemented method for controlling a production system for producing a product optimized with respect to multiple target variables, wherein
Dependencies are inferred from the claim text.