Intelligent backup scheduling and sizing
OwnerMD Fasahath Ur Rahman, Apoorva Ventrapragada +3inventors
InventorsMD Fasahath Ur Rahman, Apoorva Ventrapragada, Prabodh Saha, Madhav Manthri, Abhishek Ganguly
Life of this patent
Estimating the term…
Loading patent…
OwnerMD Fasahath Ur Rahman, Apoorva Ventrapragada +3inventors
InventorsMD Fasahath Ur Rahman, Apoorva Ventrapragada, Prabodh Saha, Madhav Manthri, Abhishek Ganguly
Estimating the term…
Future computer resource utilizations are predicted using at least one machine learning model among a group of one or more trained machine learning models. Based on the predicted future computer resource utilizations, a backup time is determined. An amount of storage to reserve for a backup is estimated using at least one machine learning model among the group of one or more trained machine learning models. At the backup time, the backup is initiated to a portion of the storage reserved based on the estimated amount.
A method comprising:
A system comprising:
A computer program product, the computer program product being embodied in a non-transitory computer readable storage medium and comprising computer instructions for:
Dependencies are inferred from the claim text.