Back to results
US 2024/0199327 A1Published application
Shuttle system and method for handling a load carrier
AssigneeGebhardt Fordertechnik GmbH
InventorsMarco Gebhardt, Thomas Klopfenstein
Life of this patent
Estimating the term…
Abstract
A method is disclosed for handling a load carrier that can be stored or removed from a rack structure. In an embodiment the method includes temporary storage of the load carrier in a buffer area, which may also serve as a transfer area to a vertical conveyor, or passing through the buffer area to transport the load carrier in a storage and retrieval area level to be moved in or out.
Claims18
A shuttle system, comprising:
- a rack structure with a storage and retrieval level and at least one warehouse level for storing load carriers,
- a vertical conveyor for transporting load carriers between the levels of the rack structure,
- at least one shuttle arranged to travel in the levels of the rack structure,
- at least one buffer location, which is situated in the storage and retrieval level directly next to the vertical conveyor, the at least one buffer location is set up to temporarily receive a load carrier, and the at least one buffer location comprises a transfer section on a storage side, on a pre-zone side, and on a vertical conveyor side for receiving and delivering the load carrier,
- wherein the at least one shuttle is further set up to transfer a load carrier to be retrieved to the buffer location and to take over a load carrier to be stored from the buffer location, wherein this takeover and handover is performed via the transfer section on the storage side,
- wherein the buffer location is further set up to take over or hand over a load carrier also from or to a conveyor acting as an interface between the storage and retrieval level and a zone located outside the rack levels, wherein the takeover and handover is performed via the transfer section on the pre-zone side,
- wherein the vertical conveyor is operable to transfer the load carrier from the buffer location to the vertical conveyor or take the load carrier over from the vertical conveyor, wherein the takeover and transfer is performed via the transfer section on the vertical conveyor side,
- wherein a direction along which the buffer location transfers the load carrier to or takes the load carrier over from the conveyor acting as an interface runs parallel to a direction along which the at least one shuttle transfers the load carrier to or takes the load carrier over from the buffer location, and
- wherein a direction along which the vertical conveyor transfers the load carrier to or takes the load carrier over from the buffer location runs orthogonally to the direction along which the conveyor acting as an interface transfers the load carrier to or takes the load carrier over from the buffer location.
6 more elements
A method for handling a load carrier, wherein a storing or retrieving of the load carrier is performed in or from a rack structure, the method comprising:
- temporarily storing the load carrier on a buffer location, which at the same time serves as a transfer section to a vertical conveyor, or passing this buffer location to store the load carrier in a storage and retrieval level or retrieve the load carrier from the storage and retrieval level.
Dependencies are inferred from the claim text.