Back to results
US 2024/0005223 A1Published application
Smart building systems with automated readiness verification
OwnerJoseph Morris, Matthew P. Kaiser +2inventors
InventorsJoseph Morris, Matthew P. Kaiser, Carol T. Tumey, Mark K. Hendrickson
Life of this patent
Estimating the term…
Abstract
A method includes running a scan configured to determine available resources of a building management system, determining a difference between the available resources and requirements of a smart building feature, determining one or more updates to the building management system expected to eliminate the difference, and implementing the one or more updates.
Claims20
A method, comprising:
- running a scan configured to determine available resources of a building management system;
- determining a difference between the available resources and requirements of a smart building feature;
- determining one or more updates to the building management system expected to eliminate the difference;
- and
- implementing the one or more updates.
2 more elements
A method, comprising:
- detecting a change in a building management system by comparing results of instances of a scan configured to determine available resources of the building management system;
- performing, based on the change, an action selected from:
- installing a device for use in the building management system;
- updating software on a device of the building management system;
- activating a first smart building feature for the building management system;
- or
- deactivating a second smart building feature for the building management system.
4 more elements
A method, comprising:
- running a scan configured to determine available points of a building management system;
- performing a comparison of the available points to different sets of points used by different smart building features;
- providing, based on the comparison, an indication of a first subset of the different smart building features able to operate for the building management system and of a second subset of the different smart building features unable to operate for the building management system.
Dependencies are inferred from the claim text.