Back to results
US 2024/0003222 A1Published application
Methods for shortening waiting-on-cement time in a subterranean well
AssigneeSchlumberger Technology Corporation
InventorsDominic Perroni, Bipin Jain, Anatoly Medvedev, Carlos Abad, Christopher Daeffler
Life of this patent
Estimating the term…
Abstract
Methods for shortening the waiting-on-cement (WOC) time during primary and remedial cementing operations are disclosed. A fluid pill is injected into the wellbore that comprises reactants. The reaction is acclerating hydration and shortening the time necessary for the slurry to set and harden.
Claims24
A method, comprising:
- performing a primary cementing operation, whereby a cement slurry is placed in an annular region between a casing and a formation wall;
- injecting a fluid pill inside an interior of the casing string, the fluid pill comprising reactants that cause an exothermic reaction;
- and
- causing the exothermic reaction to take place inside the casing interior, thereby heating the cement slurry and reducing a setting time of the cement slurry.
1 more element
(canceled)
A method, comprising:
- performing a squeeze cementing operation, whereby a cement slurry is pumped into one or more perforations in a casing string, and forced into an annular region between the casing string and a formation wall, or into a formation matrix, or both;
- injecting a fluid pill inside an interior of the casing string adjacent to the one or more perforations, the fluid pill comprising reactants that cause an exothermic reaction;
- and
- causing the exothermic reaction to take place inside the casing interior, thereby heating the cement slurry and reducing a setting time of the cement slurry.
1 more element
(canceled)
A method, comprising:
- performing a cement plug operation, whereby a cement slurry is placed in a portion of an open borehole, or in a portion of a casing interior;
- injecting a fluid pill such that it rests on top of the cement slurry, the fluid pill comprising reactants that cause an exothermic reaction;
- and
- causing the exothermic reaction to take place, thereby heating the cement slurry and reducing a setting time of the cement slurry.
1 more element
(canceled)
Dependencies are inferred from the claim text.