Method and device for solving packet loss due to misalignment of drx on-duration in nr v2x
AssigneeLG Electronics Inc.
InventorsGiwon PARK, Seungmin LEE, Seoyoung BACK, Jongwoo HONG
Life of this patent
Estimating the term…
Abstract
Proposed is an operation method of a first device (100) in a wireless communication system. The method may comprise the steps of: receiving sidelink (SL) data related to a first SL service from a second device (200) at a first time point within an active time of a second SL discontinuous reception (DRX) configuration related to a second SL service; and starting a first timer of a first SL DRX configuration related to the first SL service on the basis of reception of the SL data.
Claims16
A method for performing, by a first device, wireless communication, the method comprising:
- receiving, from a second device, sidelink (SL) data related to a first SL service at a first time point within an active time of a second SL discontinuous reception (DRX) configuration related to a second SL service;
- and
- starting a first timer of a first SL DRX configuration related to the first SL service, based on the reception of the SL data,
- wherein the first timer is counted from a second time point at which a second timer related to an on-duration of the first SL DRX configuration expires, and
- wherein the first time point is after the second time point.
A first device for performing wireless communication, the first device comprising:
- one or more memories storing instructions;
- one or more transceivers;
- and
- one or more processors connected to the one or more memories and the one or more transceivers, wherein the one or more processors execute the instructions to:
- receive, from a second device, sidelink (SL) data related to a first SL service at a first time point within an active time of a second SL discontinuous reception (DRX) configuration related to a second SL service;
- and
- start a first timer of a first SL DRX configuration related to the first SL service, based on the reception of the SL data,
- wherein the first timer is counted from a second time point at which a second timer related to an on-duration of the first SL DRX configuration expires, and
- wherein the first time point is after the second time point.
A device adapted to control a first user equipment (UE), the device comprising:
- one or more processors;
- and
- one or more memories operably connectable to the one or more processors and storing instructions, wherein the one or more processors execute the instructions to:
- receive, from a second UE, sidelink (SL) data related to a first SL service at a first time point within an active time of a second SL discontinuous reception (DRX) configuration related to a second SL service;
- and
- start a first timer of a first SL DRX configuration related to the first SL service, based on the reception of the SL data,
- wherein the first timer is counted from a second time point at which a second timer related to an on-duration of the first SL DRX configuration expires, and
- wherein the first time point is after the second time point.
16-20. (canceled)
Dependencies are inferred from the claim text.