Method for determining the stimulated reservior volume of horizontal wells by coupling reservoir flow
AssigneeSouthwest Petroleum University
InventorsYongming LI, Ang LUO, Yu PENG, Xuefeng YANG, Cheng CHANG
Life of this patent
Estimating the term…
Loading patent…
AssigneeSouthwest Petroleum University
InventorsYongming LI, Ang LUO, Yu PENG, Xuefeng YANG, Cheng CHANG
Estimating the term…
The present invention discloses a method for determining the stimulated reservoir volume of horizontal wells by coupling reservoir flow, comprising the following steps: establishing a reservoir grid based on the reservoir geological model of the target well and adding an initial fracture unit; calculating the stress intensity factor at the fracture tip, judging the fracture initiation and determining the total number of fracture units; calculating the fluid pressure of fracture units, the pore pressure distribution and water saturation distribution of the reservoir matrix and micro-fractures during hydraulic fracturing; working out the stimulated reservoir volume of the horizontal well according to the fracture parameters, pressure distribution and water saturation distribution in shale reservoirs. The present invention can simulate fracture propagation, fracturing fluid leak-off and reservoir fluid flow in the whole fracturing process, determine the stimulated reservoir volume of horizontal wells.
A method for determining the stimulated reservoir volume of horizontal wells by coupling reservoir flow, comprising the following steps:
Dependencies are inferred from the claim text.