Projection-welding spinning tensioner and molding method thereof
AssigneeZhejiang Dongxing Auto Parts CO., LTD
InventorZhaoxing PAN
Life of this patent
Estimating the term…
Loading patent…
AssigneeZhejiang Dongxing Auto Parts CO., LTD
InventorZhaoxing PAN
Estimating the term…
A projection-welding spinning tensioner includes a first spoke and a second spoke. The first spoke includes a first rim end, a first plate end and a first center plate end. The second spoke includes a second rim end, a second plate end and a second center plate end. The first and second spokes have a same structure and are arranged in a mirror-symmetrical manner. Several projection-welding points are disposed on opposing surfaces of the first plate end and/or the second plate end, the projection-welding points are annularly arranged at an interval, the projection-welding points are arranged in a form of a concentric circle to form a least two annular arrangements, welded fixation of the first plate end and the second plate end is completed through the projection-welding points. A cavity groove for holding a bearing is formed inside after the first and second center plate ends are docked.
A projection-welding spinning tensioner, comprising a first spoke and a second spoke, wherein the first spoke comprises a first rim end, a first plate end and a first center plate end, the second spoke comprises a second rim end, a second plate end and a second center plate end, the first spoke and the second spoke have a same structure, the first spoke and the second spoke are arranged in a mirror-symmetrical manner, several projection-welding points are disposed on opposing surfaces of the first plate end and/or the second plate end, the several projection-welding points are annularly arranged at an interval, the several projection-welding points are arranged in a form of a concentric circle to form at least two annular arrangements, welded fixation of the first plate end and the second plate end is completed through the projection-welding points, and a cavity groove for holding a bearing is formed inside after the first center plate end and the second center plate end are docked.
Dependencies are inferred from the claim text.