Tunnel boring machine having a device for detecting a content of critical gas
AssigneeHerrenknecht AG
InventorsJENS BRANDT, MARKUS MÜNCHBACH, ALBERT FEISST
Life of this patent
Estimating the term…
Loading patent…
AssigneeHerrenknecht AG
InventorsJENS BRANDT, MARKUS MÜNCHBACH, ALBERT FEISST
Estimating the term…
A device for detecting a content of critical gas in a mining chamber of a tunnel boring machine includes a separation module by which a fluid fed in via an extraction line connection is cleaned of solid and liquid components. A gas line arrangement arranged downstream of the separation module in the flow direction of the fluid carries the fluid, including substantially only gaseous components, through a pressure reducer and through a flow control valve of a metering module by which the gas to be analyzed can be delivered in a controlled manner assisted by a double diaphragm pump and a pressure stabilizer to a gas analysis unit even at high pressures in the cavity.
1-14.
A tunnel boring machine with a device for detecting a content of critical gas in a cavity (118) rearward of a cutting wheel (106) with an extraction line (124) that extends between a mining chamber (118) as a cavity and the device, with a separation module (224) for separating the gas to be detected from a fluid and with a gas analysis unit (133) downstream of the separation module (224), wherein a metering module (240) for controlled charging of a gas analysis unit (133) with separated gas is arranged downstream of the separation module (224), that the metering module (240) has a pressure reducer (239) and a flow control valve (251) downstream of the pressure reducer (239), and that a double diaphragm pump (245) is provided downstream of the pressure reducer (239).
The tunnel boring machine of clam 15, wherein downstream of the pressure reducer (239) there is a Y-junction (254) which is asymmetrical with regard to the divided volumetric flows and has a downstream main arm (257) and a downstream secondary arm (260) and that the volumetric flow measuring module (266) is arranged in the main arm (257) downstream of the Y-junction (254).
Dependencies are inferred from the claim text.