Back to results
US 2023/0067916 A1Published application
Methods and systems for construction implement management
OwnerZachary Liollioinventor
Life of this patent
Estimating the term…
Abstract
Methods, systems, and apparatus are described herein for providing operational efficiency at a construction site through a connected system of on-board mobile computers.
Claims20
A method comprising:
- receiving, by a computing device, one or more user inputs;
- determining, based on the one or more user inputs, one or more construction activities;
- determining, based on the one or more construction activities, one or more construction tasks associated with at least one construction activity of the one or more construction activities;
- determining, based on the one or more construction tasks, one or more construction implements;
- sending to a construction implement of the one or more constructions implements, a message;
- and
- causing, based on the message, the construction implement to execute the construction task.
4 more elements
An apparatus, comprising:
- one or more processors;
- and
- memory storing processor executable instructions that, when executed by the one or more processors, cause the apparatus to:
- receive, by the apparatus, one or more user inputs;
- determine, based on the one or more user inputs, one or more construction activities;
- determine, based on the one or more construction activities, one or more construction tasks;
- determine, based on the one or more construction tasks, one or more construction implements;
- send to at least one construction implement of the one or more constructions implements, a message;
- and
- cause, based on the message, the construction implement to execute the construction task.
7 more elements
A system comprising a computing device configured to:
- receive, by the apparatus, one or more user inputs;
- determine, based on the one or more user inputs, one or more construction activities;
- determine, based on the one or more construction activities, one or more construction tasks;
- determine, based on the one or more construction tasks, one or more construction implements;
- send to at least one construction implement of the one or more constructions implements, a message;
- and
- cause, based on the message, the construction implement to execute the construction task;
- and
- the construction implement, configured to receive the message.
6 more elements
Dependencies are inferred from the claim text.