Model construction support system and model construction support method
AssigneeHitachi, Ltd.
InventorKeiro MURO
Life of this patent
Estimating the term…
Loading patent…
AssigneeHitachi, Ltd.
InventorKeiro MURO
Estimating the term…
A model construction support system supports searching for a feature used to construct a prediction model that outputs an objective variable related to a predicted event for a machine based on explanatory variables, and a division method for dividing the explanatory variables into groups to improve calculation accuracy of the objective variables based on the prediction model. The system divides the explanatory variables into a plurality of groups, calculates accuracy of the features set based on the explanatory variable in the groups, and calculates a score of the feature in the groups based on the accuracy and a support ratio of the explanatory variable to all of the explanatory variables before division. The system calculates accuracy of a group division feature used to divide the explanatory variables, and a score in the groups based on the score and the accuracy in the groups.
A model construction support system, which is an information processing system configured to support searching for an identification feature used to construct a prediction model that outputs an objective variable related to a predicted event for a machine based on input explanatory variables, and a division method for dividing the explanatory variables into groups to improve calculation accuracy of the objective variable based on the prediction model, the model construction support system comprising:
A model construction support method, which is an information processing method executed by an information processing system configured to support searching for an identification feature used to construct a prediction model that outputs an objective variable related to a predicted event for a machine based on input explanatory variables, and a division method for dividing the explanatory variables into groups to improve calculation accuracy of the objective variable based on the prediction model, the model construction support method comprising:
Dependencies are inferred from the claim text.