Railway vehicle and control method and system therefor, and train control and management system
AssigneeBYD Company Limited
InventorsWenjuan WANG, Xiaobo XU
Life of this patent
Estimating the term…
Abstract
A railway vehicle control method includes: receiving information of a target railway vehicle in front of a current railway vehicle and a current speed of the current railway vehicle; controlling, based on the information of the target railway vehicle and the current speed, the current railway vehicle to operate, and determining an operation requirement for the target railway vehicle; and transmitting the operation requirement for the target railway vehicle to a central server.
Claims10
A railway vehicle control method, comprising:
- receiving information of a target railway vehicle and a current speed of a current railway vehicle, the target railway vehicle is in front of the current railway vehicle;
- controlling, based on the information of the target railway vehicle and the current speed, the current railway vehicle to operate, and determining an operation requirement for the target railway vehicle;
- and
- transmitting the operation requirement for the target railway vehicle to a central server, to cause the central server to transmit the operation requirement for the target railway vehicle to the target railway vehicle, so that the target railway vehicle operates based on the operation requirement for the target railway vehicle.
(canceled)
A train control and management system (TCMS), comprising:
- a receiving module, configured to receive information of a target railway vehicle and a current speed of a current railway vehicle, the target railway vehicle is in front of the current railway vehicle;
- a control module, configured to control, based on the information of the target railway vehicle and the current speed, the current railway vehicle to operate, and determine an operation requirement for the target railway vehicle;
- and
- a communication module, configured to transmit the operation requirement for the target railway vehicle to a central server, to cause the central server to transmit the operation requirement for the target railway vehicle to the target railway vehicle, so that the target railway vehicle operates based on the operation requirement for the target railway vehicle.
(canceled)
A railway vehicle control system, comprising:
- a train control and management system (TCMS), installed on a current railway vehicle and configured to:
- receive information of a target railway vehicle and a current speed of a current railway vehicle, the target railway vehicle is in front of the current railway vehicle, control, based on the information of the target railway vehicle and the current speed, the current railway vehicle to operate, determine an operation requirement for the target railway vehicle, and transmit the operation requirement for the target railway vehicle to a central server;
- an obstacle detection apparatus, mounted to the current railway vehicle and configured to:
- detect the information of the target railway vehicle in front of the current railway vehicle, and transmit the detected information of the target railway vehicle to the TCMS;
- and
- the central server, located outside the current railway vehicle and configured to:
- receive the operation requirement for the target railway vehicle from the TCMS, and transmit the operation requirement for the target railway vehicle to the target railway vehicle, so that the target railway vehicle operates based on the operation requirement for the target railway vehicle.
Dependencies are inferred from the claim text.