Steel tube supporting construction structure for beam transfer floor in high-rise building and construction method therefor
AssigneeHunan No. 6 Engineering Co. Ltd.
InventorXiong DAI
Life of this patent
Estimating the term…
Loading patent…
AssigneeHunan No. 6 Engineering Co. Ltd.
InventorXiong DAI
Estimating the term…
A steel tube supporting construction structure for beam transfer floor in high-rise building and a construction method therefor are provided. The construction structure includes an upper beam formwork, a lower beam formwork, and a stand. The lower beam formwork is provided with a first column formwork on a top wall thereof, the upper beam formwork is detachably provided with a second column formwork on the bottom wall thereof. The second column formwork is detachably provided with a bottom formwork on a lower end of the second column formwork. The second column formwork is provided with a connecting member respectively on an upper end and a lower end thereof for connecting with the upper beam formwork, the lower beam formwork and the bottom formwork. The first column formwork and the second column formwork are each detachably provided with an upright barrel formwork in the vertical direction.
A steel tube supporting construction structure for a beam transfer floor in a high-rise building, the steel tube supporting construction structure comprising:
A steel tube supporting construction method for a beam transfer floor in high-rise building, using a steel tube supporting construction structure for a beam transfer floor in high-rise building, wherein, the steel tube supporting construction structure comprises an upper beam formwork, a lower beam formwork and a stand, the upper beam formwork and the lower beam formwork being separately and fixedly arranged on the stand from top to bottom, the lower beam formwork being vertically provided on a top wall thereof with a first column formwork, the first column formwork having a first opening on the top thereof, the upper beam formwork being provided in a bottom wall thereof with a through hole adapted to the first opening of the first column formwork, the upper beam formwork being detachably provided on the bottom wall thereof with a second column formwork, the second column formwork having a second opening at its an upper end and a third opening at its a lower end, the second column formwork being slidably arranged on the stand in a vertical direction, the second column formwork being detachably provided at the low end thereof with a bottom formwork, for opening and closing the third opening at the lower end of the second column formwork, the second column formwork being provided on an upper end and a lower end thereof with connecting members for connecting with the upper beam formwork, the lower beam formwork and the bottom formwork, an upright barrel formwork being detachedly provided in both the first column formwork and the second column formwork in a vertical direction, the method comprising:
Dependencies are inferred from the claim text.